Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
221-22.jpg
221-22173 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
221-21.jpg
221-21163 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.Sep 19, 2015
221-20.jpg
221-20223 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.Sep 19, 2015
221-19.jpg
221-19201 viewsHardie Siding, Tomlinson Steel cars make up the bulk of the fleet and the rear portions of the Goldsworthy Line trains.Sep 19, 2015
221-18.jpg
221-18191 viewsHardie Siding, as the train continues, Gunderson USA smooth sided cars and Portec USA ribbed sided cars make up the front portion of the train.Sep 19, 2015
221-17.jpg
221-17200 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.Sep 19, 2015
221-16.jpg
221-16234 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.Sep 19, 2015
221-15.jpg
221-15217 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.Sep 19, 2015
221-14.jpg
221-14221 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.Sep 19, 2015
221-13.jpg
221-13225 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02 is backing out onto the mainline with an empty train that will continue onto Yarrie for loading.Sep 19, 2015
221-12.jpg
221-12217 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units.Sep 19, 2015
221-11.jpg
221-11248 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units. Note the end of train device are two flashing red lights, and no digitair.Sep 19, 2015
221-10.jpg
221-10230 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 heads away from Hardie past the location equipment and the train crew shelter with a loaded train bound for Finucane Island.Sep 19, 2015
221-09.jpg
221-09356 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
221-08.jpg
221-08232 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
221-07.jpg
221-07239 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
221-06.jpg
221-06232 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
221-05.jpg
221-05251 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.Sep 19, 2015
221-04.jpg
221-04258 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.Sep 19, 2015
221-03.jpg
221-03386 viewsHardie Siding, with the days of Goninan GE rebuilt C36-7M units operating numbered, 5513 serial 88-078 / 4839-02 rebuilt from AE Goodwin ALCo C636 5453 serial G6012-2, the drivers side cab 'Kalgan' nameplate has already removed to be fitted to the new GE AC6000 6074.Sep 19, 2015
4019 files on 201 page(s) 189

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional