Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
203-12.jpg
203-12360 viewsBing Siding, BHP Iron Ore General Electric AC6000 model 6076 'Mt Goldsworthy' serial 51068 with an empty train. Cab side view with name board, steerable bogie and Driver Cosgrove at the controls.Aug 16, 2014
203-11.jpg
203-11394 viewsBing Siding, BHP Iron Ore General Electric AC6000 model 6076 'Mt Goldsworthy' serial 51068 with an empty train. Cab side view with name board, steerable bogie and Driver Cosgrove at the controls.Aug 16, 2014
203-10.jpg
203-10358 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-08.jpg
203-08376 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
203-09.jpg
203-09354 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-07.jpg
203-07380 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
203-06.jpg
203-06395 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. Cab side view with name board and steerable bogie.Aug 16, 2014
203-05.jpg
203-05395 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working.Aug 16, 2014
203-04.jpg
203-04566 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-01.jpg
203-01348 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
203-03.jpg
203-03412 viewsBing Siding, an empty train behind a pair of BHP General Electric AC6000 units 6076 'Mt Goldsworthy' serial 51068 and class leader 6070 'Port Hedland' serial 51062 run around the passing track up to the departure signal.Aug 16, 2014
203-02.jpg
203-02364 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
203-00.jpg
203-00403 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
197-08.jpg
197-08336 viewsGoldsworthy Junction, looking east, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081, note the CCTV camera mounted under the radiator wing.Jul 22, 2014
197-07.jpg
197-07331 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-06.jpg
197-06303 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-05.jpg
197-05350 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-04.jpg
197-04366 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-03.jpg
197-03308 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.Jul 22, 2014
197-02.jpg
197-02329 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.Jul 22, 2014
4058 files on 203 page(s) 202

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional