Last additions - Pilbara negative and digital Albums - Iron Ore |

240-05416 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits with the hood removed exposing the ALCo 251F engine prior to removal and being sent by road to Rail Heritage WA's Bassendean museum for preservation. 25th June 2002.Jan 30, 2018
|
|

240-04406 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits with the hood removed exposing the ALCo 251F engine, radiator fan drive and oil filter assembly prior to engine removal and being sent by road to Rail Heritage WA's Bassendean museum for preservation. 25th June 2002.Jan 30, 2018
|
|

240-03414 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits with the hood removed exposing the ALCo 251F engine prior to removal and being sent by road to Rail Heritage WA's Bassendean museum for preservation. 25th June 2002.Jan 30, 2018
|
|

240-01489 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits awaiting its engine removal prior to being sent by road to Rail Heritage WA's Museum at Bassendean, Perth for preservation. 25th June 2002.Jan 30, 2018
|
|

240-02767 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits awaiting its engine removal prior to being sent by road to Rail Heritage WA's Museum at Bassendean, Perth for preservation. 25th June 2002.Jan 30, 2018
|
|

240-20225 viewsWickham, left hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.Jan 30, 2018
|
|

242-20849 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2 stands in the afternoon sunlight.Jan 30, 2018
|
|

242-08405 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.Jan 23, 2018
|
|

242-07478 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.Jan 23, 2018
|
|

242-06495 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.Jan 23, 2018
|
|

242-05564 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

242-03314 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

242-04318 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

242-02320 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

242-01577 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

241-09400 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to 5510 following collision repairs. June 2002.Jan 23, 2018
|
|

171121 0973193 viewsBarker Siding, Loram rail grinder MPC 2, driving and generator end of a converted 85 foot waggon. 21st November 2017.Dec 06, 2017
|
|

171121 0971194 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.Dec 06, 2017
|
|

171121 0970217 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.Dec 06, 2017
|
|

171121 0968213 viewsBarker Siding, Loram rail grinder MPC 2, driving and generator car or waggon. Looks to be a converted 85 foot waggon. This used to be operational in the US as LMIX 602. 21st November 2017.Dec 06, 2017
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
81 |  |
 |
 |
 |
 |
 |
 |
|