Last additions - Pilbara negative and digital Albums - Iron Ore |

170915 0717127 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1010 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
|
|

170915 0716142 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1002 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
|
|

170915 0715131 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1005 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
|
|

170915 0714134 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1007 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
|
|

170915 0713143 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1009 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
|
|

170915 0712151 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1006 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
|
|

170915 0710172 viewsGreat Northern Highway 18.2 km grade crossing, empty Roy Hill fuel train powers along bound for Tad Yard with General Electric built ES44ACi unit RHA 1019 serial 64300 leading eleven of Roy Hill's twelve tank waggons. 15th September 2017. View map here.Dec 06, 2017
|
|

040407 080602218 viewsSixteen inch split rim with the elongated stud holes following loose nuts and the wheel parting company with the car! 7th April 2004.Nov 26, 2017
|
|

040407 080551269 viewsTHE WHEEL NUUUTTSS!! Here we see Toy Titan in a spot of bother when the rear LHS wheel parted company at the 23 km Newman mainline. Was lucky to get out of it with so little damage! Wednesday 7th April 2004.Nov 26, 2017
|
|

040407 080434184 viewsToy Titan had the LHS rear wheel part company and went bush at the 23 km on the Newman mainline, this is the scour mark. Wednesday 7th April 2004.Nov 26, 2017
|
|

040407 080418198 viewsToy Titan on the lean when the LHS rear wheel parted company and went bush. 23 km Newman mainline. Wednesday 7th April 2004.Nov 26, 2017
|
|

040407 080354203 viewsToy Titan on the lean when the LHS rear wheel parted company and went bush. 23 km Newman mainline. Wednesday 7th April 2004.Nov 26, 2017
|
|

040407 080337302 viewsToy Titan on the lean when the LHS rear wheel parted company and went bush. 23 km Newman mainline. Wednesday 7th April 2004.Nov 26, 2017
|
|

040407 075425201 viewsMooka Siding, LED colour light signal head MAN 6 located at the north end of the passing siding, departure signal.Nov 26, 2017
|
|

040407 075405186 viewsMooka Siding, north end looking north, 31.4 km showing the standard layout of the track when it was single track with passing sidings, MAN 4 on the left is the mainline departure and MAN 6 in the passing track departure, all LED type. The DED 'dragging equipment detection' bars are visible along with the arrival signal and relay room. 7th April 2004.Nov 26, 2017
|
|

040407 075353184 viewsMooka Siding, looking south with the back track switch and road branching off the passing track, the mainline is on the right. 7th April 2004.Nov 26, 2017
|
|

040407 075227172 viewsMooka Siding, north end looking south past the arrival signal LED type MAN 3, DED 'dragging equipment detector' bars are visible before the turnout, passing track branching off to the left. 7th April 2004.Nov 26, 2017
|
|

040407 075131169 viewsMooka Siding, Mooka North location relay room with solar panel array and radio link mast visible. 7th April 2004.Nov 26, 2017
|
|

040407 075058170 viewsMooka Siding, Mooka North location relay room with solar panel array on the north side, arrival LED type signal MAN 3 visible beside the mainline. 7th April 2004.Nov 26, 2017
|
|

040407 073334187 viewsGoldsworthy Junction, Barclay Mowlem's R.E.L.A.M lease ballast plough, Knox Kershaw KBR 850 model travels east along the Goldsworthy line. 7th April 2004.Nov 26, 2017
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
83 |  |
 |
 |
 |
 |
 |
 |
|