Image search results - "128" |

0128 110602 17204 viewsRobe River ore waggon 128, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
|
|

030720 160654r2877 viewsNelson Point Loco Service Shop, BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03 / 92-128 sits in the afternoon Pilbara sun displaying its brand new colours, painting only finished on it this day and about ten minutes after these photos where taken the unit was back in service! Sunday 20th July 2003.
|
|

040812 123214r832 viewsYarrie line 148 km, east of Taplin, BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03/92-128 works a 'mixed' of 12 ballast and 10 loaded GML waggons towards Hedland following a derailment further out near the Yarrie Mine, 1230 hrs 12th August 2004.
|
|

040812 155940r776 viewsGoldsworthy Junction BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03/92-128 is on the Yarrie line with a mixed ballast and loaded ore train awaiting a Pilot to come out from Hedland to pilot the train into Nelson Point yard at 1600 hrs 12th August 2004.
|
|

040815 165746496 viewsNelson Point Car Dumper 2, a waggon originally built by Comeng WA in 1973-74 and numbered 1283. But note the rounded bottom edge, this shows that it is a rebuilt ore waggon with 3CR12 stainless steel sides, while the ends, transoms and side ribs are the originals. These waggons were originally of a plain steel construction and were painted inside to prevent rust and wear. 15th August 2004.
|
|

050624 3346628 viewsGoldsworthy Siding 110.8 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 having just cut off and pulled forward from the Sundowner in the passing track 24th June 2005.
|
|

100602 8545251 viewsWO type iron ore waggon WO 31284 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 164 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, seen here loaded with fines west of Binduli, 2nd June 2010.
|
|

100602 8681243 viewsWO type iron ore waggon WO 31282 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 162 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, West Kalgoorlie 2nd June 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100602 8699242 viewsWO type iron ore waggon WO 31284 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 164 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, loaded with fines, West Kalgoorlie 2nd June 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|

100605 9371258 viewsWO type iron ore waggon WO 31281 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 161 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|

100729 01493260 viewsWO type iron ore waggon WO 31281 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 161 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, empty train 29th July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|

100731 02345220 viewsWO type iron ore waggon WO 31283 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 163 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on loaded train 6413 at Binduli Triangle, 31st July 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100731 02457236 viewsWOE type iron ore waggon WOE 33588 final one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-128 and fleet number 9078 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
|
|

100731 02468233 viewsWOE type iron ore waggon WOE 31128 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-118 and fleet number 710 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
|
|

100731 02891167 viewsWO type iron ore waggon WO 31281 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 161 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on loaded train 7415 at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|

100731 03066208 viewsWO type iron ore waggon WO 31280 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 160 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOG for gypsum in late 1980s till 1994 when it was re-classed back to WO.
|
|

100731 03068204 viewsWO type iron ore waggon WO 31282 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 162 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100731 03140218 viewsWO type iron ore waggon WO 31284 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 164 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|

100822 5941204 viewsWO type iron ore waggon WO 31283 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 163 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle 22nd August 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100822 6272202 viewsWO type iron ore waggon WO 31281 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 161 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 1416 at Hampton, 22nd August 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|
|