Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "185"
080304_2184.jpg
01185 080304 2184511 viewsThomas Yard, down the rail welding end, side view of slave waggon 1185, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. March 4, 2008.
0185_170728_09948.jpg
0185 170728 09948276 viewsRobe River ore waggon 185, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0185_170729_0204.jpg
0185 170729 0204246 viewsRobe River ore waggon 185, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0185_180616_1741.jpg
0185 180616 1741296 viewsRobe River ore waggon 185, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
080120_1491r.jpg
080120 1491r2986 viewsRowley Yard, FMG's General Electric built Dash 9-44CW DC locomotive 008 serial 58185. These units were some of the last of this model built by GE. 20th January 2008.
090814_2068r.jpg
090814 2068r1048 viewsWoodstock, BHP Billiton SD70ACe locomotive 4327 was built by Electro-Motive as an EMD model SD70ACe for the BNSF railroad in the USA with serial 20066862-056 but was sold to BHP while under construction as one of ten similar units to be diverted to BHP in an all over BNSF base orange earning them the nickname of 'pumpkins' after the BNSF livery. They were standard US domestic units and required substantial modifications to be afforded lead unit status for BHP. Here we some a couple of the modifications like the snow plough and the middle handrail and the windscreen protector is just visible. 14th August 2009.
140601_4674.jpg
140601 4674543 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHCH type waggon CHCH 7785 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. June 1, 2014.
141-2-07.jpg
141-2-07567 viewsSunshine, broad gauge V/Line A class A 78 Clyde Engineering EMD model AAT22C-2R serial 84-1185 rebuilt from B 78 Clyde Engineering EMD model ML2 serial ML2-19 with an N set and D van on a down Ballarat passenger train head onto No.3 Rd, point rodding.
141-2-08.jpg
141-2-08587 viewsSunshine, broad gauge V/Line A class A 78 Clyde Engineering EMD model AAT22C-2R serial 84-1185 rebuilt from B 78 Clyde Engineering EMD model ML2 serial ML2-19 with an N set and D van on a down Ballarat passenger train head into Sunshine platform No.3 past semaphore and disc signal post 33, point rodding, station platform.
152-06.jpg
152-06593 viewsMorwell station platform, V/Line broad gauge A class A 78 Clyde Engineering EMD model AAT22C-2R serial 84-1185 rebuilt from B 78 Clyde Engineering EMD model ML2 serial ML2-19 with up Bairnsdale passenger train 8412 surrenders the large electric staff for the Traralgon - Morwell section to the signaller, in heavy fog.
160522_2419.jpg
160522 2419694 viewsParkeston, 7MP7 priority service train, RQAY 21859 container waggon, one of a hundred waggons built in 1981 by EPT NSW as type NQAY, recoded to RQAY in 1994, with a 24' Pacific National curtainsider PNXC 4603 and a 20' side door SCF box SCFU 305076.
160525_4507.jpg
160525 4507605 viewsParkeston, 3PM7 priority service train, RQAY 21859 container waggon, one of a hundred waggons built in 1981 by EPT NSW as type NQAY, recoded to RQAY in 1994. Pacific National 48' curtainsider PNXC 5647.
160528_8347.jpg
160528 8347580 viewsParkeston, 5SP5 intermodal train, RLUY 18574 in Sadleirs traffic. One of one hundred and fifty built by Comeng NSW as the KLY type louvre vans in 1975/76. Transferred to National Rail in 1994 and recoded from NLKY / NLUY.
161111_2417.jpg
161111 2417479 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQNY 32185 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with two Bis Industries hard-top 25U0 type sulphur containers, undecorated BISU 100017 and decaled BISU 100094.
170729_0145.jpg
170729 0145589 viewsEmu Siding, a loaded Rio Tinto train rolls down grade past the signals at the 74.8 km West Mainline behind Rio Tinto stripe liveried General Electric built ES44DCi unit 8194 serial 61853 and plain silver sister unit 8111 and Dash 9-44CW stablemate 7055 as they head to the Cape Lambert port for unloading. July 29, 2017. GeoData
170730_0528.jpg
170730 0528556 viewsIndee, at the 55 km on the BHP line a loaded train from Yandi is heading north behind Progress Rail Muncie USA built SD70ACe/LCi unit 4400 serial 20118575-010 with second unit 4348. 30th July 2017. GeoData.
1855_Comeng_040815_165338.jpg
1855 Comeng 040815 165338122 viewsNelson Point, Car Dumper 3, empty BHP Iron Ore waggon 1855, a Comeng WA build from batch of 175 built in 1975, looks to have been partially resheeted. August 15, 2004.
1855_Comeng_040815_165348.jpg
1855 Comeng 040815 165348120 viewsNelson Point, Car Dumper 3, empty BHP Iron Ore waggon 1855, a Comeng WA build from batch of 175 built in 1975, looks to have been partially resheeted. August 15, 2004.
1856-6856_050828_5064.jpg
1856-6856 050828 5064120 viewsTunkawanna, empty Hamersley Iron Bradken built S series waggon pair 1856 control and 6856 slave built in April 2003. August 28, 2005.
190107_0609.jpg
190107 0609511 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00185 built by CSR Yangtze Co China serial 2014/382-185 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
23 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional