Image search results - "51062" |

040507 170218r798 viewsWalla, BHP GE AC6000 locomotive class leader 6070 'Port Hedland' serial 51062 leads EMD built model SD40-2 unit 3085 serial 786170-25, former Union Pacific UP 3523, as they power up out of Walla siding having had an empty train cross pass, 7th May 2004.
|
|

040811 161635r536 viewsGoldsworthy Junction, BHP GE AC6000 class leader 6070 'Port Hedland' serial 51062 runs through the junction leading EMD model SD40R unit 3089 serial 31512 formally Southern Pacific SD40 SP 8431 with a loaded Yandi train 11th August 2004.
|
|

203-04538 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.
|
|

203-06364 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. Cab side view with name board and steerable bogie.
|
|

203-07341 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.
|
|

203-08346 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.
|
|

203-10327 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.
|
|

203-21232 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 leading class leader 6070 'Port Hedland' serial 51062 as they power their train out of the passing track at Bing South.
|
|

221-20256 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.
|
|

221-21179 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.
|
|

221-22191 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
|
|

221-23216 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
|
|

221-24194 viewsYandi One mine loadout balloon loop, overview of the stockpile, the train can be seen in the middle distance on the right.
|
|

221-25190 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
|
|

221-26195 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
|
|

221-27194 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
|
|

221-28206 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
|
|

221-29203 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
|
|

227-25199 views30 km area, third unit on an empty ore train is class leader 6070 'Port Hedland' serial 51062 a General Electric AC6000 built by GE Erie. GeoData.
|
|
|
|