Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "547"
041014_122434.jpg
041014 122434455 viewsPilbara Railways Historical Society, the Locotrol 'cab' from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Eventually the three locomotives had driving cabs fitted. Donated to the Society around 1998? 14th October 2004.
041014_122446.jpg
041014 122446414 viewsPilbara Railways Historical Society, the builders plate from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Donated to the Society around 1998? 14th October 2004.
041014_122920.jpg
041014 122920406 viewsPilbara Railways Historical Society, the Locotrol 'cab' from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Eventually the three locomotives had driving cabs fitted. Donated to the Society around 1998? 14th October 2004.
050108_142945r.jpg
050108 142945r978 viewsCape Lambert, Hamersley Iron owned Pilbara Iron General Electric built Dash 9-44CW unit 7061 serial 54768 leads Robe owned Pilbara Rail 9402 serial 53456 and Hamersley Iron 7085 serial 47764 with a loaded train from the Deepdale mine past signal OB1 on the line to Cape Lambert. The switch for the quarry triangle is just in front of the train. Saturday 8th January 2005.
050109_093124.jpg
050109 093124647 viewsPilbara Railways Historical Society, removed Locotrol cab from Goninan CM40-8ML ALCo to GE rebuild unit 5663 serial 8412-08/94-154, this unit along with the two sister cab-less units all ended up having normal driving cabs retro-fitted around 1996-97. 9th October 2005.
050110_100724r.jpg
050110 100724r871 viewsWestern Creek junction, Robe River owned General Electric Dash 9-44CW unit 9434 serial 54767 in Pilbara Iron livery leads similar Hamersley Iron owned unit 7095 serial 52842 in original livery off the interconnecting line from the Cape Lambert - Deepdale line onto the Dampier - Tom Price line with an empty train bound for West Angelas. This junction is known as Western Creek and the double track of Emu can be seen to the left. Monday 10th January 2005.
050625_3768.jpg
050625 3768644 viewsBroome Rd grade crossing at the 57.1 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland across the highway 25th June 2005.
050625_3779.jpg
050625 3779586 viewsDe Grey at the 54 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland 25th June 2005.
050625_3784.jpg
050625 3784605 viewsAllan Siding, at the 51 km just east of Node 3 on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner waiting for an empty train to pull in clear into the siding on its way back to Hedland 25th June 2005.
050625_3788.jpg
050625 3788617 viewsTabba Tabba Creek bridge at the 48 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its return to Hedland 25th June 2005.
050625_3797.jpg
050625 3797624 viewsAllan Siding at the 46 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.
050625_3801.jpg
050625 3801620 viewsAllan Siding at the 46 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main as it crosses 5630 'Zeus' on an empty train refuged in the passing track while returning to Hedland 25th June 2005.
050625_3822.jpg
050625 3822560 viewsNode #2 at the 38 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.
050625_3829.jpg
050625 3829663 viewsNode #2 at the 38 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.
050625_3834.jpg
050625 3834644 viewsPippingarra near the 31 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.
050625_3840.jpg
050625 3840712 viewsGoldsworthy Junction, BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading runs off the Goldsworthy or GML line past signal GJ 2 onto the Newman mainline with the Sundowner on its return to Hedland 25th June 2005.
0547_141124_6784.jpg
0547 141124 67842 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0547_160727_0974.jpg
0547 160727 09744 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0547_170513_8696.jpg
0547 170513 86962 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0547_170729_0197.jpg
0547 170729 01970 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
118 files on 6 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional