Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "5650"
041001_152919r.jpg
041001 152919r806 viewsRedbank Bridge, BHP Goninan GE rebuild CM40-8M 5650 'Yawata' serial 8412-07 / 93-141 notches back up into power as it passes the examiner doing his 'roll by' entering Nelson Point yard as a Doug Gould road train passes over the top. A very rare shot indeed! 1530 hrs 1st October 2004.
100508_8226r.jpg
100508 8226r670 viewsNelson Point, BHP Billiton's Goninan GE CM40-8M unit 5650 'Yawata' serial 8412-07 / 93-141 rebuilt from AE Goodwin M636C ALCo 5481, cab side shot shows Hi-Ad bogie, modified handrail and black side loco numbers, only 5639 and 5650 carried black numbers till retirement with the original repaint 5632 having its black numbers changed to white. 8th May 2010.
130720_1469r.jpg
130720 1469r760 viewsBing Siding, BHP Billiton's Goninan GE CM40-8M unit 5650 'Yawata' serial 8412-07 / 93-141 rebuilt from AE Goodwin M636C ALCo 5481, side shot shows Hi-Ad bogies, modified handrail and black side loco numbers, only 5639 and 5650 carried black numbers till retirement with the original repaint 5632 having its black numbers changed to white. 8th May 2010.
229-03.jpg
229-03369 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with 5650 'Yawata' serial 8412-07 / 93-141 leading sister unit 5642, grade crossing is the YT 311.5 km. GeoData.
229-15.jpg
229-15179 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
229-16.jpg
229-16179 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
229-17.jpg
229-17168 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
229-18.jpg
229-18180 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
229-19.jpg
229-19141 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-20.jpg
229-20156 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-21.jpg
229-21146 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-22.jpg
229-22162 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-23.jpg
229-23162 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-24.jpg
229-24152 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister unit drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan, on the left the mid-train remotes can just be made out. GeoData.
229-25.jpg
229-25165 viewsYandi Two loadout exit side, Goninan rebuild CM40-8M GE units 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, both units carry the BHP Iron Ore teal and marigold livery for the logo. GeoData.
229-26.jpg
229-26154 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 with sister unit 5642 drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-27.jpg
229-27157 viewsYandi Two loadout exit side, Goninan rebuild CM40-8M GE units 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, both units carry the BHP Iron Ore teal and marigold livery for the logo. GeoData.
229-28.jpg
229-28147 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 with sister unit 5642 drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
229-29.jpg
229-29173 viewsYandi Two loadout exit side, Goninan rebuild CM40-8M GE units 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, both units carry the BHP Iron Ore teal and marigold livery for the logo. GeoData.
229-30.jpg
229-30156 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister unit drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan, on the left the mid-train remotes can just be made out. GeoData.
49 files on 3 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional