Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "608"
040806_091254r.jpg
040806 091254r864 viewsGoldsworthy Junction, BHP Goninan GE rebuild CM40-8MEFI 5666 'Taranto' serial 8412-11 / 94-157, was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, is in charge of the Weighbridge Calibration train which is situated in the middle of the switches at the Goldsworthy Junction. 5666 will do several trips back and forward over the weighbridge at various speed to allow the technicians to calibrate it as well as having to clear the mainline for loaded and empty train movements. 0915 hrs 6th August 2004.
050109_093033.jpg
050109 093033661 viewsPilbara Railways Historical Society, the cab from scrapped Australian built MLW M636 model MLW ALCo by Comeng NSW 5495 serial C6084-11 built in Nov-1974. Sister complete unit 5502 can be seen beyond the ALCo crank and cam shafts holding up the veranda. 9th October 2005.
050109_093041.jpg
050109 093041729 viewsPilbara Railways Historical Society, the cab from scrapped Australian built ALCo MLW M636 model by Comeng NSW in November 1974 for Mt Newman Mining and BHP Iron Ore numbered 5495 serial number C6084-11. 9th October 2005.
060714_6685r.jpg
060714 6685r904 viewsBing Siding finds BHP Goninan GE rebuild CM40-8M locomotive 5654 'Kashima' serial 8412-11 / 93-145 as it shunts the steel (rail) train 14th July 2006.
060714_6721r.jpg
060714 6721r784 viewsHesta, 226 km sees BHP Goninan GE rebuild CM40-8M 5657 'Fukuyama' serial 8412-02 / 94-148 with EMD SD40-2 3081 and SD40R 3089 as they struggle upgrade with a loaded Yandi train, mid-train remote units visible are a pair of EMD SD70ACe/LC locos 4302 and 4311 14th July 2006.
0608_160306_1468.jpg
0608 160306 14680 viewsRobe River ore waggon 608, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
081217_0448r.jpg
081217 0448r809 viewsWoodstock Siding BHP Goninan GE rebuild and former cab-less CM40-8ML unit 5665 'Rotterdam' serial 8412-10 / 94-156 runs along the mainline with the rail or steel train under the FMG flyover. It is not uncommon to see long hood leading units on BHP work trains. 17th December 2008.
140601_4493.jpg
140601 4493225 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7608 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
150522_8176.jpg
150522 8176464 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M unit 5656 serial 8412-01 / 94-147 was originally Comeng NSW built ALCo M636 unit 5494 serial C6084-10.
150522_8188.jpg
150522 8188361 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M unit 5657 serial 8412-02/94-148 awaits the shears. Full details of this unit can be seen here .
150522_8189.jpg
150522 8189481 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M unit 5656 serial 8412-01/94-147 awaits the shears. Full details of this unit can be seen here .
160128_00000.avi
160128 00000507 viewsSee 5661 reduced to frame level in just over 7 minutes.
A 176 tonnes locomotive is no match for a 40 tonne CAT excavator with a T-Rex type hydraulic set of shears.
160128_00378.jpg
160128 00378553 viewsWedgefield, Sims Metal yard, like a dog with a bone, the 40 tonne excavator has a hold of former BHP Billiton Goninan rebuild CM40-8M locomotive 5661 serial 8412-06/94-152.
160128_00407.jpg
160128 00407436 viewsWedgefield, Sims Metal Yard, rear view of Goninan rebuilt GE model CM40-8MEFI 5669 serial 8412-02, builders no. 95-160 flanked on the left by sister unit 5668 and on the right by older CM40-8M 5642. Note the newer rebuilds have marker lights while 42 has none but has a snow plough on the no. 2 end. Also note the roof access ladder rungs have been removed.
160128_00416.jpg
160128 00416449 viewsView of the cab roof of Goninan rebuild GE model CM40-8M 5654, serial 8412-11, builders no. 93-145, shows tropical roof, marker and head lights, aerials, sand filling hatch covers wipers and strobe light in place of single trumpet horn.
160128_00567.jpg
160128 00567376 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 has had the hood removed showing the GE 7FDL-16 prime mover and GMG187 alternator, the fuel tank indicates that the frame is a Comeng built ALCo M636.
160128_00584.jpg
160128 00584321 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 is now match for the 40 tonne Cat excavator model 330DL as the shears tear the cab to pieces.
160128_00610.jpg
160128 00610287 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 is now match for the 40 tonne Cat excavator model 330DL as the shears tear the cab to pieces.
160128_00654.jpg
160128 00654318 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 cab has had the drivers side torn out revealing the remains on the control stand.
160128_00789.jpg
160128 00789311 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 has the back wall of the cab torn off.
126 files on 7 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional