Image search results - "660" |

0660 160306 15280 viewsRobe River ore waggon 660, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

100-19573 viewsAlbury yard, Wilson Street, NSWSRA standard gauge 44 class 4479 AE Goodwin ALCo model DL500B serial G3421-19 and 422 class 42205 Clyde Engineering EMD model J26C serial 69-660, candy livery, north bound Inter-Capital Daylight. Geodata.
|
|

100-20543 viewsAlbury yard, Wilson Street, NSWSRA standard gauge 44 class 4479 AE Goodwin ALCo model DL500B serial G3421-19 and 422 class 42205 Clyde Engineering EMD model J26C serial 69-660, candy livery, north bound Inter-Capital Daylight, trailing shot. Geodata.
|
|

160128 00385496 viewsWedgefield, Sims Metal yard, Goninan rebuild CM40-8M 5660 serial 8412-05/94-151 surrounded by remains and sibling units.
|
|

160128 00403485 viewsWedgefield, Sims Metal Yard, drivers side cab view of the ALCo Hi-Ad bogie with external secondary coil suspension of the original M636 unit 5478.
|
|

160128 00404451 viewsWedgefield, Sims Metal Yard, front view of Goninan rebuilt GE model CM40-8M 5660 serial 8412-05, builders no. 94-151.
|
|

160531 9853277 viewsBinduli, 3PM4 steel train, VQCY 660
|
|

203-14390 viewsBing Siding, a loaded BHP Iron Ore train with double Dash 8 power behind Goninan GE rebuild CM40-8M models 5660 'Kure' serial 8412-05 / 94-151 and sister 5643 'Mt Whaleback' serial no 8281-08 / 92-132 as they cross an empty train in the siding with an AC6000 unit.
|
|

229-05223 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, grade crossing is the YT 311.5 km. GeoData.
|
|

229-07242 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, note the sheet metal windscreen protector plates, grade crossing is the YT 311.5 km. GeoData.
|
|

229-08232 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151, cab side. GeoData.
|
|

229-10251 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
|
|

229-11261 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
|
|

229-13257 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151. GeoData.
|
|

240328 2951178 viewsWOE type iron ore waggon WOE 33660 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons with fleet number 7071, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

241-33242 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist with the Ore Car Repair Shop in the background. June 2002.
|
|

241-34257 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist. June 2002.
|
|

241-35260 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
|
|

241-36253 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
|
|

241-37263 viewsNelson Point, Car Dumper 2 holding roads, two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
|
|
|