Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "785"
0785_081209_0132.jpg
0785 081209 01320 viewsRobe River ore waggon 785, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view showing drop rib end at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0785_081209_0133.jpg
0785 081209 01330 viewsRobe River ore waggon 785, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
140601_4674.jpg
140601 4674236 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHCH type waggon CHCH 7785 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
160530_9280.jpg
160530 9280248 viewsBinduli, 7SP3 intermodal service, RQCY 785
231020_8167.jpg
231020 8167201 viewsParkeston, QQYY type 40' container waggon QQYY 57853 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000918 with Cristal decal and CRM 000484 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8182.jpg
231020 8182192 viewsParkeston, QQYY type 40' container waggon QQYY 57854 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000227 with Cristal decal and CRM 000028 with Tronox decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8187.jpg
231020 8187191 viewsParkeston, QQYY type 40' container waggon QQYY 57852 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001331 with Tronox decal and CRM 001046 with Tronox decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8192.jpg
231020 8192206 viewsParkeston, QQYY type 40' container waggon QQYY 57855 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001014 with Tronox decal and CRM 001702 with Tronox decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8255.jpg
231020 8255212 viewsParkeston, QQYY type 40' container waggon QQYY 57850 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000482 with Cristal decal and CRM 001192 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
240328_2877.jpg
240328 2877161 viewsWOE type iron ore waggon WOE 33785 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons and had fleet number 7196 before the Aurizon yellow sides and logos, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
250501_0396.jpg
250501 0396141 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2785 - GA 2786, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
 
11 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional