Image search results - "791" |

0791 170729 02310 viewsRobe River ore waggon 791, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view, shows drop rib detail, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

140601 4640213 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHCH type waggon CHCH 7791 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

231020 8156197 viewsParkeston, QQYY type 40' container waggon QQYY 57918 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000189 with Cristal decal and CRM 000118 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8180216 viewsParkeston, QQYY type 40' container waggon QQYY 57910 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000374 with Cristal decal and CRM 000617 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8217192 viewsParkeston, QQYY type 40' container waggon QQYY 57911 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000830 with Tronox decal and yellow corner posts and CRM 000039 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8236211 viewsParkeston, QQYY type 40' container waggon QQYY 57914 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000469 with Tronox decal and yellow corner posts and CRM 000882 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

250501 0339160 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2791 - GA 2792, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
|
|