Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "8003"
050110_122348r.jpg
050110 122348r956 viewsMaitland Siding, an empty Mesa J bound train runs along the passing track crossing a loaded sitting on the mainline. The tank waggons behind the locos are 8001 and 8002 both built in 1972 with a 45,000 litre capacity and 8003 built in 1979 with a 100,000 litre capacity, all three were built by Comeng NSW. Monday 10th January 2005.
8003_050110_122348.jpg
8003 050110 1223482 viewsMaitland Siding [Sinding Two], Robe River diesel fuel tank waggon 8003 running loaded on an empty ore train, built by Comeng NSW in March 1979 with a 100,000 litre capacity. 1223 hours, January 10, 2005.
8003_060716_7199.jpg
8003 060716 71993 viewsWestern Creek, Robe River diesel fuel tank waggon 8003 running empty on a loaded ore train, built by Comeng NSW in March 1979 with a 100,000 litre capacity. 1401 hours, July 16, 2006.
 
3 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional