Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "819"
0819_060722_7612.jpg
0819 060722 76120 viewsRobe River ore waggon 813, built by Centurion Industries WA, rotary coupler end handbrake side empty partial view, at the 11.7 km, Cape Lambert. July 22, 2006.
0819_170728_09939.jpg
0819 170728 099390 viewsRobe River ore waggon 819, built by Centurion Industries WA, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
0819_170729_0213.jpg
0819 170729 02130 viewsRobe River ore waggon 819, built by Centurion Industries WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
090121_1549r.jpg
090121 1549r963 viewsBoodarie, departing the Herb Elliot car dumper balloon are FMG General Electric built Dash 9-44CW units 013 serial 58190 and 006 serial 58183 with 204 empty waggons bound for the passing track at Rowley Yard to cut out and add waggons. 21st January 2009.
090912_2277r.jpg
090912 2277r1182 viewsBoodarie, at the entrance to the Herb Elliot port car dumper balloon loop the final unit of FMG's 15 General Electric built Dash 9-44CW locos 015 serial 58192 with compressor set 9003-9004 shunts from the loaded waggon line to the empty waggon line at the 4.2 km under Proceed Authority 57 to make way for the incoming loaded train. 12th September 2009.
170729_0145.jpg
170729 0145296 viewsEmu Siding, a loaded Rio Tinto train rolls down grade past the signals at the 74.8 km West Mainline behind Rio Tinto stripe liveried General Electric built ES44DCi unit 8194 serial 61853 and plain silver sister unit 8111 and Dash 9-44CW stablemate 7055 as they head to the Cape Lambert port for unloading. 29th July 2017. GeoData
231020_8202.jpg
231020 8202225 viewsParkeston, QQYY type 40' container waggon QQYY 57819 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000063 with Tronox decal and CRM 001344 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
 
7 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional