Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "913"
130708_0767.jpg
130708 0767238 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 13 A, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
130708_0923.jpg
130708 0923210 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 13, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
160523_2989.jpg
160523 2989259 viewsParkeston, 7SP3 intermodal train, RQAY 21913 container waggon, one of a hundred waggons built in 1981 by EPT NSW as type NQAY, recoded to RQAY in 1994. Loaded with an SCF leased 40' 4EG1 type container Austrans AUSU 471412 [1] and a 20' 2EB0 type Toll box TOSU 200672 [9].
160523_2990.jpg
160523 2990264 viewsParkeston, 7SP3 intermodal train, RQAY 21913 container waggon, one of a hundred waggons built in 1981 by EPT NSW as type NQAY, recoded to RQAY in 1994. Code board and NSW number plate.
161109_1941.jpg
161109 1941260 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 13 with hungry boards loaded with gypsum.
180616_1756.jpg
180616 1756313 viewsAt the 81 km on the Tom Price West mainline, Rio Tinto loco 8133 with serial 59136 a GE Erie built GE model ES44DCi from the 2nd order in Rio Tinto Stripes livery leads Dash 9-44CW unit 9431 with a loaded train of S and C series waggons operating in AutoHaul™ as they approach Emu and then continue onto Dampier. 16th June, 2018. GeoData.
180616_1757.jpg
180616 1757309 viewsAt the 81 km on the Tom Price West mainline, Rio Tinto loco 8133 with serial 59136 a GE Erie built GE model ES44DCi from the 2nd order in Rio Tinto Stripes livery, heavily faded from acid washing, is from the third order of these units built in June 2008 at GE's Erie plant. 16th June, 2018.
 
7 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional