Image search results - "931" |

0931 081209 011954 viewsRobe River ore waggon 931, built by Centurion Industries WA, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
|
|

0931 081209 012042 viewsRobe River ore waggon 931, built by Centurion Industries WA, rotary coupling end panel and plate view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
|
|

0931 160306 159554 viewsRobe River ore waggon 931, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

0931 170728 0994166 viewsRobe River ore waggon 931, built by Centurion Industries WA, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
|
|

0931 170729 021051 viewsRobe River ore waggon 931, built by Centurion Industries WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
|
|

0931 180616 187540 viewsRobe River ore waggon 931, built by Centurion Industries WA, fixed coupler handbrake side loaded view at Maitland Siding on the Deepdale line, June 16, 2018.
|
|

231020 8219256 viewsParkeston, QQYY type 40' container waggon QQYY 57931 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000254 with Tronox decal and yellow corner posts and CRM 000277 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

250501 0554229 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2931 - GA 2932, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
|