Image search results - "WO31411" |

100731 02849503 viewsWO type iron ore waggon WO 31411 is one of a batch of eleven replacement waggons built by WAGR Midland Workshops between 1970 and 1971 with fleet number 187 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on loaded train 7415 at Binduli Triangle, July 31, 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|

100822 6230470 viewsWO type iron ore waggon WO 31411 is one of a batch of eleven replacement waggons built by WAGR Midland Workshops between 1970 and 1971 with fleet number 187 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 1416 at Hampton, August 22, 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|
|
|
|
|