Image search results - "enh33" |
060113 2427147 viewsCeduna, originally one of sixty two Kinki Sharyo built NH type for the NAR in 1966, now coded ENH type ENH 33 with hungry boards loaded with gypsum, on loaded train 6DD2 near the 436 km post.
|
|
130708 081757 viewsMoule, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 33 Q, without hungry boards loaded with gypsum, Mewett Rd grade crossing, 470.1 km.
|
|
130708 085650 viewsPenong Junction, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 33 Q, without hungry boards loaded with gypsum [url=https://goo.gl/maps/45FyW] located at the 429.7 km[url].
|
|
130708 089148 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 33 Q, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|
130708 089255 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 33 Q, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|
161109 195548 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 33 with hungry boards loaded with gypsum.
|
|
|
|
|