Most viewed - 0226 |

226-10194 viewsRedmont, at the 202 km the mid-train trailing remote Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03/92-128. GeoData.
|
|

226-12193 viewsGarden Siding south end arrival signal post with dual heads, GNS 3 and GNS 3R which is a repeater signal aimed up the hill for loaded trains running down grade. GeoData.
|
|

226-15192 viewsShaw North, 216.5 km, view looking south with the 700 metre radius curve around to the right and the departure signals with the repeater posts at the far left and far right of the image. GeoData.
|
|

226-07188 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with Goninan rebuild CM40-8M GE unit 5653 'Chiba' serial 8412-10/93-144 leading sister unit 5643 down the grade. GeoData.
|
|

226-13188 viewsShaw North, 216.5 km, arrival signal SWN 3 Shaw North 3 at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room. GeoData.
|
|

226-11185 viewsGarden Siding looking north from the south end. Signal post with dual heads, GNS 3 and GNS 3R which is a repeater signal aimed up the hill for loaded trains running down grade. The small units each side of the mainline is a Cold Wheel Detector. As the trains are running down a 5 km long 1.5 percent grade the trains are under dynamic and train brake control to maintain the train speed below the limit. GeoData.
|
|

226-36185 viewsShaw siding 219 km, 5654 'Kashima' serial 8412-11 / 93-145 is the trail or slave remote on the mid-train pair of units, note the large flat fuel tank indicating this unit was a Comeng NSW built ALCo before rebuild. GeoData.
|
|

226-17184 viewsShaw North, 216.5 km, departure signals SWN 4 for the mainline and SWN 6 for the loop for loaded trains that are about to descend the steep 1.5 percent decent to Garden Siding. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with solar array mounted above the cutting. The signal on the top of the cutting on the right is SWN 6R the repeater post for SWN 6 due to the 700 metre radius curve north bound trains approach this location. GeoData.
|
|

226-29184 viewsShaw siding, the loaded train is winning the climb as second unit 5636 'Munda' serial 8151-11 / 91-122 another Goninan CM40-8M GE rebuild assists in powering the train to port. GeoData.
|
|

226-05181 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with 5653 and 5643 leading the charge. GeoData.
|
|

226-37180 viewsShaw siding back track, 219 km, a defected waggon has been cut off a loaded Yandi train, waggon 1567 is a Comeng WA build from a batch of 288 built in 1974. GeoData.
|
|

226-04179 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
|
|

226-02178 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
|
|

226-06178 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with Goninan rebuild CM40-8M GE unit 5653 'Chiba' serial 8412-10/93-144 leading sister unit 5643 down the grade. GeoData.
|
|

226-19178 viewsShaw North, 216.5 km, departure repeater signal post SWN 4R for the mainline is aimed across the 700 metre radius curve that north bound trains face. GeoData.
|
|

226-18173 viewsShaw North, 216.5 km, expanded view showing departure signals from left to right, SWN 4R repeater for SWN 4, SWN 4 for the mainline and SWN 6 for the loop, then SWN 6R on the far right. Loaded trains are about to descend the steep 1.5 percent decent to Garden Siding from this location. The interlocking room with solar array mounted above the cutting in the background with the arrival signal also visible. The repeaters are due to the 700 metre radius curve north bound trains round to approach this location. GeoData.
|
|

226-34173 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the vinyl windscreen protectors are fitted to the windscreens, note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
|
|

226-35173 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the CCTV camera is visible under the radiator wing, this was a trial for single man crewing when operating long end lead, also note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
|
|

226-08172 viewsRedmont, 202 km with a loaded Yandi train speeding north towards the port behind a pair of CM40-8M locomotives with the distinctive flat top loading profile of the Yandi loadouts. GeoData.
|
|

226-03171 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
|
|
|