Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0226

Most viewed - 0226
226-06.jpg
226-06227 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with Goninan rebuild CM40-8M GE unit 5653 'Chiba' serial 8412-10/93-144 leading sister unit 5643 down the grade. GeoData.
226-08.jpg
226-08222 viewsRedmont, 202 km with a loaded Yandi train speeding north towards the port behind a pair of CM40-8M locomotives with the distinctive flat top loading profile of the Yandi loadouts. GeoData.
226-09.jpg
226-09222 viewsRedmont, at the 202 km the mid-train remotes Goninan rebuild CM40-8M GE unit 5644 'Kangan' serial 8281-09/92-133 leads sister unit 5639. GeoData.
226-34.jpg
226-34222 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the vinyl windscreen protectors are fitted to the windscreens, note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
226-33.jpg
226-33218 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.
226-20.jpg
226-20217 viewsShaw North, 216.5 km, all the departure signals in a row looking across the cutting. SWN 4R, SWN 4, SWN 6 and SWN 6R for north bound movements. GeoData.
226-23.jpg
226-23216 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.
226-28.jpg
226-28216 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
226-01.jpg
226-01215 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
226-24.jpg
226-24214 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.
226-25.jpg
226-25213 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
226-26.jpg
226-26209 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
226-14.jpg
226-14207 viewsShaw North, 216.5 km, expanded view with arrival signal SWN 3 Shaw North 3 which is at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with the north end points and the departure signals and repeater posts due to the large curve loaded trains face. GeoData.
226-31.jpg
226-31207 viewsShaw siding, the loaded train heading north around the 698 metre radius curve behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons. GeoData.
226-32.jpg
226-32207 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.
226-27.jpg
226-27201 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
226-30.jpg
226-30198 viewsShaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. GeoData.
     
37 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional