Most viewed - 0229 |

229-03372 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with 5650 'Yawata' serial 8412-07 / 93-141 leading sister unit 5642, grade crossing is the YT 311.5 km. GeoData.
|
|

229-04191 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with second unit 5642 'Wallareenya' serial 8281-07 / 92-131 trailing sister unit 5650. GeoData.
|
|

229-06190 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing lead remote sister unit 5660. GeoData.
|
|

229-18188 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

229-15184 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

229-16182 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

229-00180 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|

229-12180 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit, cab side. GeoData.
|
|

229-02178 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|

229-11176 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
|
|

229-29176 viewsYandi Two loadout exit side, Goninan rebuild CM40-8M GE units 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, both units carry the BHP Iron Ore teal and marigold livery for the logo. GeoData.
|
|

229-13175 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151. GeoData.
|
|

229-0A174 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|

229-08173 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151, cab side. GeoData.
|
|

229-10172 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.
|
|

229-17172 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

229-01171 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|

229-09171 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit. GeoData.
|
|

229-33171 viewsYandi Two loadout exit side, as second unit 5642 'Wallareenya' serial 8281-07 / 92-131 a Goninan rebuild CM40-8M GE unit trails sister unit 5650 drag a loading train at 1.2 km/h around the loadout balloon, the waggon behind 5642 is an original Oroville waggon. GeoData.
|
|

229-14170 viewsYandi Two loadout, looking through the tunnel and the CM40-8M profile of 5650 can be just made out, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, Yandi Two features to loadout vaults for extra capacity, in later years it allowed two different products, fines and lumps to be stacked. GeoData.
|
|
|