Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 05-2015

Most viewed - 05-2015
150522_8177.jpg
150522 8177478 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M unit 5663 serial 8412-08 / 94-154, this unit was rebuilt without a cab and this cab was later retrofitted, was originally AE Goodwin NSW built ALCo M636 unit 5476 serial C6087-8. Photo of the removed cab can be seen here .
150505_7944.jpg
150505 7944477 viewsFMG Solomon Line, looking west, earth fill abutment embankment for rail line, Jingarri Creek, view from the western side, expanded view from 7942, access road visible at left. Geodata: -22.0525633 118.7199633 .
150505_7947.jpg
150505 7947476 viewsFMG Solomon Line, looking east from the 215.586 km grade crossing. Geodata: -22.0534583 118.6860400 .
150505_8003.jpg
150505 8003475 viewsFMG Solomon Line, Bowaling Claypan, located just off the Wittenoom - Roebourne Road. Geodata: -22.0843050 118.3361267 .
150522_8153.jpg
150522 8153473 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 one of a pair of new Goninan WA built CM40-8 units has already had most of the hood removed and the V16 7FDL prime mover is visible, sister unit 5647 sit along side with the same fate coming up next.
150505_7959.jpg
150505 7959471 viewsFMG Solomon Line, a pair of General Electric Dash 9-44CW locomotives 005 serial 58182 and 006 serial 58183 struggle upgrade with a loaded train at the 227 km bound for Port Hedland, the train is being assisted in the rear. Geodata: -22.0189283 118.5861050 .
150505_7953.jpg
150505 7953467 viewsFMG Solomon Line, looking west with cutting to the right, 227.5 km grade crossing in the distance, track is curving away to the left in the background. Geodata: -22.0200283 118.5880600 .
150523_8274.jpg
150523 8274466 viewsFinucane Island, loaded train arriving at the Island behind Progress Rail SD70ACe unit 4434 'Koombana' serial 20128866-003 and same batch sibling 4435 serial 20128866-004 train is running under new Roy Hill conveyor and road bridge. Geodata: -20.3363383 118.5497850 .
150505_7943.jpg
150505 7943465 viewsFMG Solomon Line, looking west, earth fill abutment embankment for rail line, Jingarri Creek, view from the western side. Geodata: -22.0525633 118.7199633 .
150522_8156.jpg
150522 8156463 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 one of a pair of new Goninan WA built CM40-8 units has already had most of the hood removed and the V16 7FDL prime mover is visible, sister unit 5647 sit along side with the same fate coming up next.
150522_8165.jpg
150522 8165462 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992.
150505_8001.jpg
150505 8001459 viewsFMG Solomon Line, zoom view looking east from west of Bow Siding, loop can be seen right back to east end through cutting, an empty train in the arvo will work here! Geodata: -22.0256300 118.4896100 .
150505_7978.jpg
150505 7978453 viewsFMG Solomon Line, waggon 3005, tare weight of 21.8 tonnes, yellow circle indicates rotary coupling, built in 2009 by CSR Yangtze Rolling Stock Co. Ltd, loaded with fines ore. Geodata: -22.0187350 118.5850917 .
150505_7991.jpg
150505 7991447 viewsFMG Solomon Line, view looking west from the east end of Bow Siding, point indicators and back track visible in the distance. Geodata: -22.0188283 118.5297867 .
150505_7988.jpg
150505 7988424 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade into the cutting, the train speed is now increasing as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
150522_8180.jpg
150522 8180419 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M units 5649 serial 8412-07/93-140 and 5638 serial 8281-02/92-127, for full details of these units past lives see here .
150522_8188.jpg
150522 8188418 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M unit 5657 serial 8412-02/94-148 awaits the shears. Full details of this unit can be seen here .
150522_8183.jpg
150522 8183417 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M units 5638 serial 8281-02/92-127, 5640 serial 8281-05/92-129 and 5659 serial 8412-04/94-150, for full details of these units past lives see here .
150507_8046.jpg
150507 8046414 viewsFMG Solomon Line, as the Nanutarra - Wittenoom Road was realigned when this line was built, this is where the western shortcut branch of the Roebourne - Wittenoom Road crosses the line before rejoining the Nanutarra Road. A loaded train behind double General Electric Dash Dash 9-44CW Co-Co locomotives, units 010 serial no. 58187 and 014 serial no. 58191 power a loaded along the straight, there are bank engines on the rear. Geodata: -22.1617767 118.1279150 .
150523_8253.jpg
150523 8253411 viewsFinucane Island, empty train heading back to Boodarie behind new Progress Rail EMD SD70ACe unit 4486 serial 20148001-019 and an older sibling 4459 serial 20138907-010. Geodata: -20.3366783 118.5496817 .
106 files on 6 page(s) 3

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional