Most viewed - 0232 |

232-093832 viewsYandi One balloon loop, BHP Iron Ore waggon 2343 built by Comeng WA as one of the second batch of one hundred and eighty three waggons built between 1969 and 1970. The white body panel signifies the rotary coupler end. February 1997. GeoData.
|
|

232-37529 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|

232-07489 viewsYandi One balloon loop cabless BHP Iron Ore Goninan rebuild CM40-8ML (L for LocoTrol) GE unit 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid-train remote power of train no. 1718 which is partway through loading on the afternoon of 3rd of February 1997. GeoData.
|
|

232-26306 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggon 2502 is a standard Comeng WA build from the third batch of 180 waggons built in 1970. Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 leads a LocoTrol remote unit built with no cab, a CM40-8ML 5665. 18th of February 1997. GeoData.
|
|

232-13284 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore 50 ton waggon 6703, one of three 'special' waggons converted from Magor USA built ore waggons by the Mt Newman Workshops. February 1997. GeoData.
|
|

232-08256 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665, both are Goninan rebuild CM40-8M GE units, 59 is still in the teal and marigold logo livery. 3rd of February 1997. GeoData.
|
|

232-36249 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|

232-05233 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665 'Rotterdam' serial 8412-10 / 94-156, both are Goninan rebuild CM40-8M GE units with 65 having an L on its' designation as cabless with LocoTrol. 3rd February 1997. GeoData.
|
|

232-06221 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cabless unit 5665, both are Goninan rebuild CM40-8M GE units, 59 is still in the teal and marigold logo livery. 3rd of February 1997. GeoData.
|
|

232-34217 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
|
|

232-33212 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|

232-10203 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|

232-12202 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|

232-16202 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|

232-32200 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|

232-15199 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71. February 1997. GeoData.
|
|

232-35198 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
|
|

232-18196 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|

232-14193 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|

232-29192 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 leads a LocoTrol remote unit built with no cab, a CM40-8ML 5665. 18th of February 1997. GeoData.
|
|
|