Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0232

Most viewed - 0232
232-32.jpg
232-32426 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
232-31.jpg
232-31425 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
232-02.jpg
232-02421 viewsYandi Two entry portal for the loadout tunnel entry sign. February 1997. GeoData.
232-12.jpg
232-12414 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
232-22.jpg
232-22409 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
232-24.jpg
232-24409 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
232-30.jpg
232-30408 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
232-19.jpg
232-19400 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls. February 1997. GeoData.
232-14.jpg
232-14399 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
232-28.jpg
232-28399 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
232-04.jpg
232-04396 viewsYandi Two, view west from near the 311.6 km grade crossing, train can be seen loading on the right. February 1997. GeoData.
232-20.jpg
232-20396 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls, view of broken coupler. February 1997. GeoData.
232-17.jpg
232-17389 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
232-00.jpg
232-00382 viewsYandi Two crushing and screening plant, built and operated by Henry Walker for BHP Iron Ore, overview from the radial stacker feed conveyor. From the left is the primary crusher, the dual secondary crushers can be made out behind the tertiary crushers in the middle and the screenhouse is the large building tot he right, the conveyor leading to the right is CV210. February 1997. GeoData.
232-21.jpg
232-21382 viewsYandi One loadout portal as a train is being loaded. Waggons are from left, a 3CR12 re-sheeted Comeng, an Oroville built by Magor USA and a standard Comeng WA build. 18th of February 1997. GeoData.
232-11.jpg
232-11378 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
232-03.jpg
232-03373 viewsYandi Two, view to the stockpile looking west from near the 311.6 km grade crossing. A train can be seen loading on the right. February 1997. GeoData.
232-23.jpg
232-23371 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
   
38 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional