Most viewed - 0233 |

233-35257 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4157, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.
|
|

233-15216 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-14213 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-30212 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5642 'Wallareenya' serial 8281-07 / 92-131 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. GeoData.
|
|

233-19211 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-09208 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-05206 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|

233-12200 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-16200 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-10199 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-18198 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-22198 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-06197 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|

233-11196 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-23196 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-02193 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|

233-29193 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-07192 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-17192 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-01191 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.
|
|
|