Most viewed - BHP_Rolling_Stock_-_Non_Ore |

050421 1386213 viewsQuarry 8, Magor USA built ballast waggon 513, originally built in 1963 for the Oroville Dam project, before coming to BHP second hand as a ballast waggon in January 1968.
|
|

050518 2072213 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 730.
|
|

050518 2115213 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view.
|
|

050518 2199213 viewsBing Siding. Side view of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
|
|

050704 3982213 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, detail of the A end and bogie and the B end of 0018, both wearing the BHP Billiton Earth livery.
|
|

050522 2732213 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #22, 6213, built by Comeng WA in February 1977 under order number 07-M-282 RY.
|
|

100717 0685213 viewsFlash Butt yard, new rail stock carrier waggon 6045, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

100717 0688213 viewsFlash Butt yard, new rail winch waggon 6047 obstructed by scrub, view from A end showing rail ramps, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110411 09995213 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
|
|

110411 09997213 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
|
|

110411 10032213 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
|
|

110606 1750213 viewsFlash Butt yard, CNR-QRRS of China built side dump waggon, built and delivered in early 2011, waggon 0711 awaits the call to duty.
|
|

150523 8212213 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
|
|

050319 0140212 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, now used as the crib waggon on the steel train, 3/4 view.
|
|

050319 0142212 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

050518 2173212 viewsBing Siding. Side view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

051001 5626212 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end, pushed into earth bund.
|
|

051001 5714212 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #24, 6005, a Scotts of Ipswich Qld built flat waggon from September 1970.
|
|

110411 09991212 viewsNelson Point, fuel tank waggon 0019 82 kL capacity, built by Comeng for BP as RTC 1, first of two such tanks, used on Mt Newman line, unsure when converted to 0019.
|
|

110411 10023212 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|
797 files on 40 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
36 |  |
 |
 |
|