Most viewed - BHP_Rolling_Stock_-_Non_Ore |

050315 0240409 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0013 and others in the BHP blue and white livery.
|
|

050724 4308409 viewsBing Siding, empty fuel tank waggon 0015, a Comeng WA built 116 kilolitre tank waggon, one of a batch of six built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|

060429 3722409 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
|
|

050518 2122408 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view with shipping decal.
|
|

050522 2733408 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #23, 6208, built by Comeng WA in February 1977 under order number 07-M-282 RY.
|
|

150523 8214408 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015, detail view of the B end.
|
|

150729 9458408 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0226, loaded with ballast.
|
|

041012 082946407 viewsBing Siding, one of twenty original Oroville Dam waggons built by Magor USA in 1963, sold to Mt Newman Mining in 1968, ballast waggon 509 (of 501-520) still in near delivered condition. Note the access ladder and the weld line where the internal plates are for bottom discharge of ballast.
|
|

050518 2074407 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 741.
|
|

050801 4763407 viewsFlash Butt yard, rail recovery and transport train, flat waggon 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
|
|

050724 4234407 viewsNelson Point yard, flat waggons in service on the Pony re-laying train as transport waggons for sleepers, with a gantry car delivering concrete sleepers to replace the removed steel sleepers. The middle waggon is an ex Goldsworthy Mining flat waggon with a Scotts of Ipswich built flat either side, built in 1970 for then Mt Newman Mining Company.
|
|

050518 2096406 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 734.
|
|

050518 2164406 viewsBing Siding. Side view of 1963 built Magor USA waggon 535, originally in ore service before conversion to a ballast waggon.
|
|

040805 095721405 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
|
|

051001 5637405 viewsFlash Butt yard, CFCLA ballast waggon CHQY class CHQY 730 behind a Dash 8 locomotive 5649.
|
|

051001 5639405 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam.
|
|

050315 0239405 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0014 and 0013 and others in the BHP blue and white livery.
|
|

060429 3761404 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining, builders plate for Scotts of Ipswich Qld with a 24th September 1970 build date, one of nine originally numbered 6005-6013.
|
|

100717 0686404 viewsFlash Butt yard, new rail stock carrier waggon 6046, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110208 9437404 viewsFlash Butt yard, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6101 in service with the rail recovery and transport train.
|
|
| 797 files on 40 page(s) |
 |
 |
 |
 |
 |
7 |  |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|