Most viewed - BHP_Track_Machines |

050917 5506365 viewsCoon Siding, on the truncated passing siding following a derailment Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|

060501 3909365 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
|
|

060501 3910365 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
|
|

050410 0516364 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050410 0526364 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050801 4755364 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator. 1st August 2005.
|
|

050421 1175363 viewsAbydos Siding backtrack, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper front view. 21st April 2005.
|
|

050421 1610363 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the front unit was later stickered as RG 2, the rear unit was stickered as RG 1 and is serial M20. 21st April 2005.
|
|

050801 4719363 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|

050801 4720363 viewsNelson Point yard, ballast plough waggon 538, modified by the Mt Newman workshops from an Magor USA built Oroville Dam ore waggon and originally coded ODCX 82160 which is still visible. 1st August 2005.
|
|

050801 4729363 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator. 1st August 2005.
|
|

050801 4744363 viewsFlash Butt yard, BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
|
|

050917 5518363 viewsCoon Siding, on the truncated passing siding following a derailment Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|

060326 3201363 viewsBing Siding, south arrival with the new western mainline in the foreground ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401. 26th March 2006.
|
|

050625 3811362 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
|
|

050625 3812362 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem track machine sleeper crane off clear of the running lines. 25th June 2005.
|
|

051001 5667362 viewsFlash Butt yard, a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. 1st October 2005.
|
|

060501 3924362 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module. 1st May 2006.
|
|

050410 0524361 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050414 0938361 viewsFlash Butt yard, Barclay Mowlem ballast regulator. 14th April 2005.
|
|
| 325 files on 17 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
10 |  |
 |
 |
 |
 |
 |
|