Most viewed - BHP_Track_Machines |

060811 8012503 viewsGarden Siding, Speno rail grinder RG 2 coupled with RG 1 in the passing track. 11th August 2006.
|
|

050410 0525502 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050518 2211502 viewsBing Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the passing track. 18th May 2005.
|
|

060501 3925502 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module, cab side view. May 1, 2006.
|
|

050412 0809501 viewsAbydos Siding backtrack, builders plate of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050414 0946501 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, view of the generator and driving module. 14th April 2005.
|
|

050412 0814500 viewsAbydos Siding backtrack, view of the rear of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

051001 5667500 viewsFlash Butt yard, a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. October 1, 2005.
|
|

050411 0600499 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 comes off the former Goldsworthy line with the Newman mainline in the foreground. 11th April 2005.
|
|

050421 1314499 viewsShaw Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the mainline track. 21st April 2005.
|
|

051001 5680499 viewsFlash Butt yard, lube chart of a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. October 1, 2005.
|
|

050410 0510498 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050421 1623498 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the front unit was later stickered as RG 2, the rear unit was stickered as RG 1 and is serial M20. 21st April 2005.
|
|

050801 4773498 viewsIn the Flash Butt yard a line up of Barclay Mowlem track machines from the closest to the camera, tamper, regulator, regulator, tamper, clip installer, tamper then BHP's mainline tamper. 1st August 2005.
|
|

060501 3910498 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. May 1, 2006.
|
|

050409 0404497 viewsShell Swagman Roadhouse, rear view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

060501 3915497 viewsAbydos Siding backtrack, Speno rail grinder RG 2, third grinding module and driving cab. May 1, 2006.
|
|

050410 0516496 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050410 0524496 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050801 4722496 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|
| 325 files on 17 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
11 |  |
 |
 |
 |
 |
|