Most viewed - BHP_Track_Machines |

050625 3812515 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem track machine sleeper crane off clear of the running lines. 25th June 2005.
|
|

060403 3267515 viewsTabba North backtrack, BHP clip driving machine, modified from a former Plasser Australia USP 3000 ballast regulator. April 3, 2006.
|
|

060501 3927515 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder, serial M20 bar coupled to RG 2. May 1, 2006.
|
|

050409 0409514 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 view of engine compartment. 9th April 2005.
|
|

050414 0953514 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, view of the first grinding module coupled. 14th April 2005.
|
|

050625 3602513 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|

050801 4721513 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|

050409 0406512 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 side view tamper frame bogie. 9th April 2005.
|
|

050412 0818512 viewsAbydos Siding backtrack, front view of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050801 4729512 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator. 1st August 2005.
|
|

050917 5516512 viewsCoon Siding, view of the tamper driving and operators cabin locations on Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|

060710 6228512 viewsAt the Broome Rd grade crossing Port Hedland, Switch Tamper SW 02 a Plasser Australia model Unimat S4 switch tamper. 10th July 2006.
|
|

050411 0611511 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 runs along the Newman mainline towards Bing Siding. 11th April 2005.
|
|

050410 0512510 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050421 1620510 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the left unit was later stickered as RG 2, the right unit was stickered as RG 1 and is serial M20. 21st April 2005.
|
|

050801 4751510 viewsFlash Butt yard, BHP clip driving machine, modified from a former Plasser Australia USP 3000 ballast regulator. 1st August 2005.
|
|

051001 5671510 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks. October 1, 2005.
|
|

060501 3906510 viewsAbydos Siding backtrack, Speno rail grinders RG 2 coupled to RG 1. May 1, 2006.
|
|

060501 3909510 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. May 1, 2006.
|
|

050407 0382509 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|
| 325 files on 17 page(s) |
 |
 |
 |
 |
 |
 |
 |
9 |  |
 |
 |
 |
 |
 |
 |
|