Most viewed - 05-08_2017 |

170728 09895194 viewsWestern Creek, the disabled Mesa A train gets underway with relief power from General Electric built ES44DCi unit 8137 serial 59140 and Dash 9-44CW unit 7082 as the operate the train with the two ES44ACi units isolated. An empty train can be seen climbing the grade up through Emu. 28th July 2017. GeoData.
|
|

170728 09855193 viewsWestern Creek - Emu area, Rio Tinto's General Electric built ES44DCi class leader 8100 serial 57996 leads two sister units, in 8176 and 8143 both in the later Rio Tinto stripe livery, with a loaded train running down from Emu Siding on the line to Dampier. The disabled Mesa A train is still on the bridge, the line to the left of the loaded is the Robe River Western Creek - Emu interconnecting line. 28th July 2017. GeoData.
|
|

170729 0145193 viewsEmu Siding, a loaded Rio Tinto train rolls down grade past the signals at the 74.8 km West Mainline behind Rio Tinto stripe liveried General Electric built ES44DCi unit 8194 serial 61853 and plain silver sister unit 8111 and Dash 9-44CW stablemate 7055 as they head to the Cape Lambert port for unloading. 29th July 2017. GeoData
|
|

170729 0415193 viewsSeven Mile yard, a loaded train departs the yard for Parker Point dumpers behind General Electric built Dash 9-44CW unit 7044 serial 57095 in Pilbara Iron livery with HI reporting marks, ES44DCi unit 8134 in Rio Tinto stripes and another Dash 9-44CW unit 9407 in Pilbara Rail livery with Robe reporting marks. 29th July 2017. GeoData.
|
|

170728 10007190 viewsBenson Falls, 91 km curve, an empty train blasts up the steep grade behind a General Electric built Dash 9-44CW unit 7072 serial 47751 leads two General Electric built ES44DCi units 8140 and 8158, 7072 is from the original delivery of Dash 9-44CW units in 1994 and is showing its age. 28th July 2017. GeoData.
|
|

170729 0191190 views109 km on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 drag upgrade. 29th July 2017. GeoData.
|
|

170730 0523190 viewsMarubeni Siding, located on the Roy Hill railway at the 152.5 to the 155.8 km, view looking south. GeoData.
|
|

170728 09819186 viewsWestern Creek, a disabled train from Mesa A on the right behind ES44ACi unit 9103 has relief locos 7082 serial 47761 a General Electric built Dash 9-44CW and a General Electric built ES44DCi unit 8137 ease up to couple onto 9103s disabled train. This image shows all these models of locomotive on the Rio Tinto mainline roster as an empty train climbs upgrade under the bridge. 28th July 2017. GeoData.
|
|

170728 09974185 viewsBenson Falls, 91 km curve, an empty train blasts up the steep grade behind a triple all General Electric built Dash 9-44CW unit power of 9409 serial 54159 and 9408 both in Pilbara Rail with Robe reporting marks, and 7060 in Pilbara Iron with HI reporting marks. 28th July 2017. GeoData.
|
|

170730 0435185 viewsBoodarie, a loaded FMG iron ore train rounds the large curve at the 5 km as it approaches the car dumper balloon loops behind Progress Rail Muncie USA built SD70ACe/LCi unit 719 serial 20118693-011 and sister 704 with the first four waggons showing panel repairs and re-lining recently undertaken. 30th July 2017. GeoData.
|
|

170729 0135184 viewsGreen Pool, an empty Rio Tinto iron ore train runs along the Lyndon River behind General Electric built ES44DCi unit 8184 serial 60782 and a pair of Pilbara Iron liveried with HI reporting marks General Electric built Dash 9-44CW units 7045 and 7049. 29th July 2017. GeoData.
|
|

170728 09782183 viewsGreen Pool on the Robe line at the 60.75 km original order and now aging General Electric built Dash 9-44CW model locomotive 7091 serial 47770 is operating in AutoHaul™ mode with a pair of GE ES44DCi units 8155 and 8165 both in the Rio Tinto stripe livery as they pass a tamper and regulator doing track work. 28th July 2017. GeoData.
|
|

170730 0500183 viewsIndee, empty Roy Hill train at the Indee Rd grade crossing at the 53.3 km with mid-train remote General Electric built ES44ACi unit RHA 1015 serial 63826. These mid-train units have 112 waggon before and after. 30th July 2017. GeoData.
|
|

170730 0492180 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 with 112 waggons, a mid-train unit and another 112 waggons. 30th July 2017. GeoData.
|
|

170729 0289179 viewsMaitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 will stay on the main as an empty train waits on the passing siding. 29th July 2017. GeoData.
|
|

170730 0490174 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 and 112 waggons, then the mid-train unit and then another 112 waggons. 30th July 2017. GeoData.
|
|

170729 0172170 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
|
|

170728 09906153 viewsWestern Creek, the disabled Mesa A train gets underway with relief power from General Electric built ES44DCi unit 8137 serial 59140 and Dash 9-44CW unit 7082 as the operate the train with the two ES44ACi units isolated. 28th July 2017. GeoData.
|
|
|
|
|