Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 05-08_2017

Most viewed - 05-08_2017
170729_0145.jpg
170729 014578 viewsEmu Siding, a loaded Rio Tinto train rolls down grade past the signals at the 74.8 km West Mainline behind Rio Tinto stripe liveried General Electric built ES44DCi unit 8194 serial 61853 and plain silver sister unit 8111 and Dash 9-44CW stablemate 7055 as they head to the Cape Lambert port for unloading. 29th July 2017. GeoData
170729_0303.jpg
170729 030378 viewsMaitland Siding on the former Robe River line an empty Mesa A bound train behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9117 serial 63830 and sister unit 9115 pull out of the passing siding and onto the mainline. 29th July 2017. GeoData.
170730_0589.jpg
170730 058978 viewsIndee, at the 55 km on the BHP line a loaded train from Yandi is heading north behind mid-train unit Electro-Motive London Ontario built SD70ACe/LC unit 4338 'Pepper' with 4481. 30th July 2017. GeoData.
170729_0163.jpg
170729 016377 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
170729_0191.jpg
170729 019177 views109 km on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 drag upgrade. 29th July 2017. GeoData.
170730_0490.jpg
170730 049077 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 and 112 waggons, then the mid-train unit and then another 112 waggons. 30th July 2017. GeoData.
170728_09895.jpg
170728 0989576 viewsWestern Creek, the disabled Mesa A train gets underway with relief power from General Electric built ES44DCi unit 8137 serial 59140 and Dash 9-44CW unit 7082 as the operate the train with the two ES44ACi units isolated. An empty train can be seen climbing the grade up through Emu. 28th July 2017. GeoData.
170730_0476.jpg
170730 047676 viewsBoodarie, a loaded Roy Hill train crossing the Great Northern Highway grade crossing with mid-train General Electric built ES44ACi unit RHA 1011 serial 62583. 30th July 2017. GeoData.
170730_0511.jpg
170730 051176 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port behind General Electric built ES44ACi units RHA 1010 serial 62582 and RHA 1004 with 224 waggons and a mid-train remote in the middle. 30th July 2017. GeoData.
170730_0518.jpg
170730 051875 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port with mid-train remote unit General Electric built ES44ACi unit RHA 1021 serial 64302 sandwiched within 224 waggons. 30th July 2017. GeoData.
170729_0322.jpg
170729 032274 viewsParker Point, an empty train is worked back towards Seven Mile yard along the Empty Car Line behind General Electric built Dash 9-44CW unit 7069 serial 47748 in the original Hamersley Iron livery from 1994 and ES44DCi unit 8195. 29th July 2017. GeoData.
170729_0135.jpg
170729 013573 viewsGreen Pool, an empty Rio Tinto iron ore train runs along the Lyndon River behind General Electric built ES44DCi unit 8184 serial 60782 and a pair of Pilbara Iron liveried with HI reporting marks General Electric built Dash 9-44CW units 7045 and 7049. 29th July 2017. GeoData.
170729_0289.jpg
170729 028973 viewsMaitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 will stay on the main as an empty train waits on the passing siding. 29th July 2017. GeoData.
170728_09974.jpg
170728 0997472 viewsBenson Falls, 91 km curve, an empty train blasts up the steep grade behind a triple all General Electric built Dash 9-44CW unit power of 9409 serial 54159 and 9408 both in Pilbara Rail with Robe reporting marks, and 7060 in Pilbara Iron with HI reporting marks. 28th July 2017. GeoData.
170730_0523.jpg
170730 052372 viewsMarubeni Siding, located on the Roy Hill railway at the 152.5 to the 155.8 km, view looking south. GeoData.
170728_10007.jpg
170728 1000770 viewsBenson Falls, 91 km curve, an empty train blasts up the steep grade behind a General Electric built Dash 9-44CW unit 7072 serial 47751 leads two General Electric built ES44DCi units 8140 and 8158, 7072 is from the original delivery of Dash 9-44CW units in 1994 and is showing its age. 28th July 2017. GeoData.
170728_09906.jpg
170728 0990666 viewsWestern Creek, the disabled Mesa A train gets underway with relief power from General Electric built ES44DCi unit 8137 serial 59140 and Dash 9-44CW unit 7082 as the operate the train with the two ES44ACi units isolated. 28th July 2017. GeoData.
170729_0172.jpg
170729 017264 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
   
58 files on 3 page(s) 3

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional