Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Rio_Tinto_Rolling_Stock_-_Non_Ore

Most viewed - Rio_Tinto_Rolling_Stock_-_Non_Ore
171018_0734.jpg
171018 0734260 viewsRio Tinto compressor waggon set CB 15, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 18th October 2017.
060723_7841.jpg
060723 7841252 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
060715_6948.jpg
060715 6948203 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. 15th July 2006.
210510_1119.jpg
210510 1119197 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTS type chute and straddle crane carrying rail waggon RTS 001 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
060723_7824.jpg
060723 7824196 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
060724_7865.jpg
060724 7865196 viewsOriginal Hamersley Iron compressor waggon set IC-1 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.
210510_1152.jpg
210510 1152196 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTS type chute and straddle crane carrying rail waggon RTS 001 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
060723_7825.jpg
060723 7825194 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
070908_0595.jpg
070908 0595194 viewsRobe River compressor waggon set IC 22 with air receiver and IC 23 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
070908_0594.jpg
070908 0594191 viewsRobe River compressor waggon sets IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors and IC 22 with receiver and IC 23 with compressors These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
210510_1108.jpg
210510 1108189 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTC type centre rail waggon RTC 012 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
060723_7845.jpg
060723 7845188 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
210510_1151.jpg
210510 1151188 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTS type straddle crane carrying rail waggon RTS 002 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
060723_7834.jpg
060723 7834184 viewsRio Tinto compressor waggon set CB 02, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here inside 7 Mile. 23rd July 2006.
060723_7846.jpg
060723 7846181 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
210510_1150.jpg
210510 1150181 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTS type straddle crane carrying rail waggon RTS 003 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
060723_7685.jpg
060723 7685180 viewsOriginal Hamersley Iron compressor waggon set IC-6 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. Seen here on the causeway just outside 7 Mile. 23rd July 2006.
210510_1117.jpg
210510 1117180 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTS type straddle crane carrying rail waggon RTS 003 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
210510_1131.jpg
210510 1131180 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTB type end rail waggon RTB 022 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
060715_6949.jpg
060715 6949178 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.
116 files on 6 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional