Home > Pilbara negative and digital Albums - Iron Ore > Rio_Tinto_Rolling_Stock

Most viewed - Rio_Tinto_Rolling_Stock
210510_1133.jpg
RTW020 210510 1133563 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 020 on Rio Tinto's Gemco Rail built rail train consist. May 10, 2021. Location.
060724_7865.jpg
IC-1 060724 7865537 viewsOriginal Hamersley Iron compressor waggon set IC-1 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.
170729_0107.jpg
CB14 170729 0107536 viewsRio Tinto compressor waggon set CB 14, receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. July 29, 2017.
210510_1132.jpg
RTW021 210510 1132536 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 021 on Rio Tinto's Gemco Rail built rail train consist. May 10, 2021. Location.
170729_0106.jpg
CB14 170729 0106531 viewsRio Tinto compressor waggon set CB 14, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. July 29, 2017.
060723_7834.jpg
CB02 060723 7834530 viewsRio Tinto compressor waggon set CB 02, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here inside 7 Mile. July 23, 2006.
060723_7846.jpg
IC-1 060723 7846529 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile July 23, 2006.
060715_6949.jpg
CB03 060715 6949525 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. July 15, 2006.
060723_7824.jpg
IC-1 060723 7824524 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile July 23, 2006.
170510_8282.jpg
CB09 170510 8282523 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. May 10, 2017.
170728_09678.jpg
CB12 170728 09678519 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. July 28, 2017.
060723_7764.jpg
CB03 060723 7764518 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. July 23, 2006.
170728_09690.jpg
CB12 170728 09690515 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. July 28, 2017.
060715_6948.jpg
CB03 060715 6948512 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. July 15, 2006.
060723_7763.jpg
CB03 060723 7763512 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. July 23, 2006.
210322_9566.jpg
BAH124 210322 9566509 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is an CRRC Qiqihar Rolling Stock Co of China built ballast waggon BAH 124 on a loaded ballast rake. Location is roughly here. March 22, 2021.
210322_9579.jpg
BAH075 210322 9579508 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is an CRRC Qiqihar Rolling Stock Co of China built ballast waggon BAH 075 on a loaded ballast rake. Location is roughly here. March 22, 2021.
060723_7845.jpg
IC-1 060723 7845507 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile July 23, 2006.
100329_8039.jpg
CB05 100329 8039505 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. March 29, 2010.
170729_0088.jpg
CB10 170729 0088503 viewsRio Tinto compressor waggon set CB 10, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. July 29, 2017.
139 files on 7 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional