Most viewed - Rio_Tinto_Rolling_Stock |

CB03 060723 7762502 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. July 23, 2006.
|
|

CB03 110602 8646498 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco. Note these waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. June 2, 2011.
|
|

IC-3 060723 7844497 viewsOriginal Hamersley Iron compressor waggon set IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile July 23, 2006.
|
|

CB09 170510 8294496 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. May 10, 2017.
|
|

BAH121 210322 9574495 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is an CRRC Qiqihar Rolling Stock Co of China built ballast waggon BAH 121 on a loaded ballast rake. Location is roughly here. March 22, 2021.
|
|

CB09 170510 8284494 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. May 10, 2017.
|
|

IC-6 060723 7685493 viewsOriginal Hamersley Iron compressor waggon set IC-6 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. Seen here on the causeway just outside 7 Mile. July 23, 2006.
|
|

CB12 170728 09688492 viewsRio Tinto compressor waggon set CB 12, receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. July 28, 2017.
|
|

CB02 060723 7828491 viewsRio Tinto compressor waggon set CB 02, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here inside 7 Mile. July 23, 2006.
|
|

IC-3 060724 7864490 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.
|
|

RTW006 210510 1114489 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 006 on Rio Tinto's Gemco Rail built rail train consist. May 10, 2021. Location.
|
|

CB09 170510 8283488 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. May 10, 2017.
|
|

CB03 110602 8647483 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here on the causeway just outside of 7 Mile. June 2, 2011.
|
|

CB09 170510 8292481 viewsRio Tinto compressor waggon set CB 09, air receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. May 10, 2017.
|
|

CB01 141124 7092480 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at 7 Mile, Dampier on November 24, 2014.
|
|

BAH100 210322 9576480 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is an CRRC Qiqihar Rolling Stock Co of China built ballast waggon BAH 100 on a loaded ballast rake. Location is roughly here. March 22, 2021.
|
|

BAH105 210322 9577478 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is an CRRC Qiqihar Rolling Stock Co of China built ballast waggon BAH 105 on a loaded ballast rake. Location is roughly here. March 22, 2021.
|
|

RTW017 210510 1103478 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 017 on Rio Tinto's Gemco Rail built rail train consist. May 10, 2021. Location.
|
|

RTW011 210510 1109478 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 011 on Rio Tinto's Gemco Rail built rail train consist. May 10, 2021. Location.
|
|

RTW013 210510 1140474 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 013 on Rio Tinto's Gemco Rail built rail train consist. May 10, 2021. Location.
|
|
|
|