Most viewed - Jim_Bisdee_Pilbara_related_images. |

22350443 viewsBassendean, Goninan workshops, loaded onto a ninety six wheel road transport float, Robe River rebuild GE CM40-8M unit 9424 serial 6266-07 / 89-84 is loaded awaiting transport to Cape Lambert. 9424 was rebuilt from former Spokane Portland & Seattle number 343 an ALCo Schenectady NY model C636 serial 6010-4, to Robe River in May 1981 as 9424, kept this number when rebuilt here. September 1991.
Jim Bisdee photo.
|
|

16954432 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5483 serial G6061-4 being prepped for rebuilding into 5659 with the 251 engine and alternator visible and other 251's to the right. October 1993.
Jim Bisdee photo.
|
|

22653427 viewsBassendean, during an Open Day at the Goninan workshops, Robe River's AE Goodwin built ALCo M636 model unit 9411 serial G6060-2 is in the middle of being rebuilt into a GE CM40-8M model. 9411 was built in July 1971, when delivered it carried road number 262.002, then following completion of the construction phase was re-numbered to 1711, before again being re-numbered to 9411. 20th July 1991.
Jim Bisdee photo.
|
|

21247425 viewsBassendean, Goninan workshops, sitting on shop bogies out the back, BHP Iron Ore Goninan GE CM40-8ML - L for LocoTrol - rebuild unit 5664 serial 8412-09 / 94-155 was rebuilt without a cab and fitted with LocoTrol II from AE Goodwin ALCo M636 5469 serial G6047-1. September 1994.
Jim Bisdee photo.
|
|

21248421 viewsBassendean, Goninan workshops, sitting on shop bogies out the back, BHP Iron Ore Goninan GE CM40-8ML - L for LocoTrol - rebuild unit 5664 serial 8412-09 / 94-155 was rebuilt without a cab and fitted with LocoTrol II from AE Goodwin ALCo M636 5469 serial G6047-1. September 1994.
Jim Bisdee photo.
|
|

22472419 viewsBassendean, Goninan workshops, Robe River's Comeng NSW built ALCo model M636 9422 serial C6103-2 is undergoing rebuilding into a GE CM40-8M unit, it would emerge rebuilt in March 1993. Image September 1992.
Jim Bisdee photo.
|
|

19796413 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 1 end. Sept 2003.
Jim Bisdee photo.
|
|

6993 001407 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
|
|

23714405 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 being scrapped to frame level, cab section on truck. December 1992.
Jim Bisdee photo.
|
|

6983 001405 viewsWelshpool, Goninan Open Day 27th August, 1988. View of the assembly floor area, brand new GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 under construction for Mt Newman Mining masked up ready for painting with sister unit 5632 inline behind it.
Jim Bisdee photo.
|
|

6990 001402 viewsWelshpool, Goninan Open Day 27th August, 1988. Rear view of the pilot and radiator wing section of Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
|
|

20955401 viewsBassendean, Goninan workshops, sitting outside the gates waiting to head to Cape Lambert, Robe River Goninan GE CM40-8M rebuild unit 9411 serial 8206-02 / 92-125, retains its original Robe River road number on a hundred and twenty wheel road float. 9411 was rebuilt into the GE CM40-8M unit from AE Goodwin ALCo M636 serial G6060-2. February 1992.
Jim Bisdee photo.
|
|

23100400 viewsBassendean, Goninan workshops, loaded onto a hundred and four six wheel road transport float, Robe River rebuild GE CM40-8M unit 9422 serial 8297-03 / 93-138 is loaded awaiting transport to Cape Lambert. 9422 was rebuilt from Comeng NSW built ALCo M636 9422 serial C6103-2 from Aug 1977 and kept this number when rebuilt here. March 1993.
Jim Bisdee photo.
|
|

20956397 viewsBassendean, Goninan workshops, sitting outside the gates waiting to head to Cape Lambert, Robe River Goninan GE CM40-8M rebuild unit 9411 serial 8206-02 / 92-125, retains its original Robe River road number on a hundred and twenty wheel road float. 9411 was rebuilt into the GE CM40-8M unit from AE Goodwin ALCo M636 serial G6060-2. February 1992.
Jim Bisdee photo.
|
|

19798395 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, close up of front pilot. Sept 2003.
Jim Bisdee photo.
|
|

6984 001395 viewsWelshpool, Goninan Open Day 27th August, 1988. New GE 7FDL-16 prime mover awaiting fitting to one of the new CM39-8 units.
Jim Bisdee photo.
|
|

23713394 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 being scrapped to frame level, cab section on truck. December 1992.
Jim Bisdee photo.
|
|

24135392 viewsBassendean, Collier Road, Key Transport hauling the final BHP Iron Ore Goninan GE rebuilt CM40-8M unit 5669 serial 8412-02 / 95-160, which is actually an CM40-8MEFI as the final three had electronic fuel injection fitted to their 7FDL-16 engines. 5669 was rebuilt from Comeng NSW built ALCo M636 model 5486 serial C6084-2. July 1995.
Jim Bisdee photo.
|
|

22331388 viewsBassendean, Goninan inside workshops, CM40-8M frames being modified. July 20 1991.
Jim Bisdee photo.
|
|

23143388 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 5482 serial G6061-3 is undergoing rebuilding into a GE CM40-8M unit, it would emerge rebuilt in September 1993 as 5652. March 1993.
Jim Bisdee photo.
|
|
|