Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Jim_Bisdee_Pilbara_related_images.

Most viewed - Jim_Bisdee_Pilbara_related_images.
22666.jpg
22666364 viewsBassendean, during an Open Day at the Goninan workshops, new GE-7FDL-16 prime-movers, some with GMG187 main alternators for install into a GE CM40-8M rebuilds and some GE752 AH traction motors. 20th July 1991.
Jim Bisdee photo.
23666.jpg
23666363 viewsBassendean, Goninan workshops, view of several Mt Newman Mining AE Goodwin built ALCo M636 units, 5481 serial G6061-2, 5473 serial G6047-5 and 5477 serial G6047-9 awaiting rebuilding. December 1992.
Jim Bisdee photo.
6994_001.jpg
6994 001363 viewsWelshpool, Goninan Open Day 27th August, 1988. Builders Plate detail for Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
5942_001_Welshpool_1986Sept.jpg
5942 001 Welshpool 1986Sept362 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive. In the September 1986 view the process has started and it is on shop bogies, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
22664.jpg
22664362 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
6982_001.jpg
6982 001359 viewsWelshpool, Goninan Open Day 27th August, 1988. Radiator section and frame for new build CM39-8 unit 5633 in the early stages of assembly.
Jim Bisdee photo.
22656.jpg
22656358 viewsBassendean, during an Open Day at the Goninan workshops, a new 'Pilbara' cab under construction which will be fitted to a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
22658.jpg
22658358 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M in the background and the two types of bogie which rode under the Mt Newman Mining ALCo units, in front is the ALCo Hi-Ad truck and behind is the MLW Dofasco truck. 20th July 1991.
Jim Bisdee photo.
6980_001.jpg
6980 001358 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 being built for Mt Newman Mining.
Jim Bisdee photo.
23142.jpg
23142355 viewsBassendean, Goninan workshops, ALCo 251 diesel engines, these are believed to have been exported to Mexico. March 1993.
Jim Bisdee photo.
23879.jpg
23879354 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. July 1993.
Jim Bisdee photo.
20859.jpg
20859353 viewsBassendean, Goninan workshops, sitting outside the locked gates having just been bought down from Port Hedland, Mt Newman Mining's AE Goodwin ALCo C636 unit 5454 serial G6012-3 on a ninety six wheel road float. 5454 will be rebuilt into CM40-8M unit 5641 by June 1992. Image taken January 1992.
Jim Bisdee photo.
22654.jpg
22654353 viewsBassendean, Goninan workshops, brand new GE CM40-8M rebuild unit for BHP Iron Ore 5634 'Boodarie' serial 8151-07 / 91-120 looks to be in the final stages of construction as it sits out side during an Open Day on 20th July 1991 with WAGR Fs 460 4-8-0 steam locomotive and Xa Class No 1405 'Warienga'. 20th July 1991.
Jim Bisdee photo.
22926.jpg
22926353 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 units 5473 serial G6047-5 and 5477 serial G6047-9 are undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993, while 5477 would emerge rebuilt in June 1993 as 5648. November 1992.
Jim Bisdee photo.
23734.jpg
23734353 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993, view of ALCo 251 prime mover and alternator. January 1993.
Jim Bisdee photo.
6981_001.jpg
6981 001353 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 being built for Mt Newman Mining, masked up ready for painting.
Jim Bisdee photo.
23732.jpg
23732352 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. January 1993.
Jim Bisdee photo.
22668.jpg
22668351 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M in the background and some ALCo Hi-Ad trucks being overhauled. 20th July 1991.
Jim Bisdee photo.
22662.jpg
22662350 viewsBassendean, during an Open Day at the Goninan workshops, a GE CM40-8M rebuild under way within the workshops, possibly 5635. 20th July 1991.
Jim Bisdee photo.
23694.jpg
23694350 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993. December 1992.
Jim Bisdee photo.
121 files on 7 page(s) 5

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional