Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Jim_Bisdee_Pilbara_related_images.

Most viewed - Jim_Bisdee_Pilbara_related_images.
6980_001.jpg
6980 00190 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 being built for Mt Newman Mining.
Jim Bisdee photo.
5948_001_Welshpool_1987Jan.jpg
5948 001 Welshpool 1987Jan89 viewsBuilders plate on Goninan rebuilt GE C36-7M unit 5506 'Mt Whaleback' serial 4839-01 / 87-071 rebuilt using Mt Newman Mining AE Goodwin ALCo C636 5455 serial G6012-4. January 1987.
Jim Bisdee photo.
3584_001.jpg
3584 00188 viewsBassendean, Wood St, delivery of the final BHP CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160. Unit was rebuilt as one of three with an electronic fuel injected prime mover by Goninan from Comeng built ALCo M636 unit 5486 serial C6084-2. Date July 1995.
Jim Bisdee photo.
6995_001_Welshpool_19880819.jpg
6995 001 Welshpool 1988081988 viewsWelshpool, Goninan workshops, under construction Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079, 19th August 1988 image.
Jim Bisdee photo.
23879.jpg
2387988 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. July 1993.
Jim Bisdee photo.
24134.jpg
2413488 viewsBassendean, Collier Road, Key Transport hauling the final BHP Iron Ore Goninan GE rebuilt CM40-8M unit 5669 serial 8412-02 / 95-160, which is actually an CM40-8MEFI as the final three had electronic fuel injection fitted to their 7FDL-16 engines. 5669 was rebuilt from Comeng NSW built ALCo M636 model 5486 serial C6084-2. July 1995.
Jim Bisdee photo.
6990_001.jpg
6990 00188 viewsWelshpool, Goninan Open Day 27th August, 1988. Rear view of the pilot and radiator wing section of Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
23760.jpg
2376087 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. January 1993.
Jim Bisdee photo.
23904.jpg
2390487 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
23907.jpg
2390787 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 ALCo 251 prime mover, being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
5949_001.jpg
5949 00186 viewsBuilders plate on Goninan rebuilt GE C36-7M unit 5506 'Mt Whaleback' serial 4839-01 / 87-071 rebuilt using Mt Newman Mining AE Goodwin ALCo C636 5455 serial G6012-4. January 1987.
Jim Bisdee photo.
23885.jpg
2388586 viewsBassendean, Goninan workshops, BHP Iron Ore GE CM40-8M rebuild unit 5649 'Pohang' serial 8412-07 / 93-140 is lifted up with the Bell road transport float being prepped underneath for road haulage to Port Hedland. 5649 was rebuilt from AE Goodwin ALCo M636 unit 5473 serial G6047-5. July 1993.
Jim Bisdee photo.
24903.jpg
2490386 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frames laying about, these were subsequently scrapped. July 1995.
Jim Bisdee photo.
6981_001.jpg
6981 00186 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 being built for Mt Newman Mining, masked up ready for painting.
Jim Bisdee photo.
5952_001.jpg
5952 00185 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
22928.jpg
2292884 viewsBassendean, Goninan workshops, view of several Mt Newman Mining ALCo units awaiting rebuilding or scrapping. November 1992.
Jim Bisdee photo.
23733.jpg
2373383 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. January 1993.
Jim Bisdee photo.
23906.jpg
2390683 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
23882.jpg
2388282 viewsBassendean, Goninan workshops, BHP Iron Ore GE CM40-8M rebuild unit 5649 'Pohang' serial 8412-07 / 93-140 is being lifted up and prepped for road haulage to Port Hedland. 5649 was rebuilt from AE Goodwin ALCo M636 unit 5473 serial G6047-5. July 1993.
Jim Bisdee photo.
6982_001.jpg
6982 00181 viewsWelshpool, Goninan Open Day 27th August, 1988. Radiator section and frame for new build CM39-8 unit 5633 in the early stages of assembly.
Jim Bisdee photo.
121 files on 7 page(s) 6

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional