Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Robe_River_Rolling_Stock

Most viewed - Robe_River_Rolling_Stock
8003_070915_0885.jpg
8003 070915 0885144 viewsRobe River diesel fuel tank waggons 8003, 8002 and 8001 running loaded at the front of an empty ore train. 8003 was built by Comeng NSW in March 1979 with a 100,000 litre capacity whilst 8002 and 8001 were built by the same builder with a 45,000 litre capacity in September 1972. At the 73.4 km on the Deepdale line, Western Creek, September 15, 2007.
0076_210322_9703.jpg
0076 210322 9703144 viewsRobe River ore waggon 076, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0188_210322_9776.jpg
0188 210322 9776144 viewsRobe River ore waggon 188, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0484_210322_9728.jpg
0484 210322 9728144 viewsRobe River ore waggon 484, built by Tomlinson Steel WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0511_210322_9741.jpg
0511 210322 9741144 viewsRobe River ore waggon 511, built by Tomlinson Steel WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0864_180616_1697.jpg
0864 180616 1697144 viewsRobe River ore waggon 864, built by Centurion Industries WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0937_210322_9771.jpg
0937 210322 9771144 viewsRobe River ore waggon 937, built by Centurion Industries WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
IC20-CB07_240619_0323.jpg
IC20-CB07 240619 0323144 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver and IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
0020_160727_0987.jpg
0020 160727 0987143 viewsRobe River ore waggon 020, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0106_081209_0127.jpg
0106 081209 0127143 viewsRobe River ore waggon 106, built by Nippon Sharyo Nihon, rotary coupler end and plate detail loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0216_160306_1414.jpg
0216 160306 1414143 viewsRobe River ore waggon 216, built by Nippon Sharyo Nihon, non-handbrake side plate view at Greenpool on the Cape Lambert line. March 6, 2016.
0601_170513_8736.jpg
0601 170513 8736143 viewsRobe River ore waggon 601, built by Tomlinson Steel WA, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0827_160306_1479.jpg
0827 160306 1479143 viewsRobe River ore waggon 827, built by Centurion Industries WA, fixed coupler handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0945_160727_0955.jpg
0945 160727 0955143 viewsRobe River ore waggon 945, built by Centurion Industries WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
1110_170729_0261.jpg
1110 170729 0261143 viewsRobe River ore waggon 1110, built by Bradken Rail Qld in April 2012, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0131_180616_1738.jpg
0131 180616 1738143 viewsRobe River ore waggon 131, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0181_180616_1720.jpg
0181 180616 1720143 viewsRobe River ore waggon 181, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0310_180616_1742.jpg
0310 180616 1742143 viewsRobe River ore waggon 310, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0420_180616_1693.jpg
0420 180616 1693143 viewsRobe River ore waggon 420, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0490_180616_1717.jpg
0490 180616 1717143 viewsRobe River ore waggon 490, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1831 files on 92 page(s) 88

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional