Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0246

Most viewed - 0246
246-28.jpg
246-2873 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. In the distance can be seen are the railway workshops. 22nd May 2002.
246-09.jpg
246-0972 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
246-34.jpg
246-3472 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 458 a Tomlinson Steel WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
246-04.jpg
246-0471 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. The Boat Beach Rd can be seen on the extreme right. 22nd May 2002.
246-36.jpg
246-3671 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
246-06.jpg
246-0669 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
246-08.jpg
246-0869 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
246-29.jpg
246-2969 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline with the normal 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
246-26.jpg
246-2668 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. 22nd May 2002.
246-12.jpg
246-1267 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
246-35.jpg
246-3567 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
246-27.jpg
246-2766 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. In the distance can be seen are the railway workshops. 22nd May 2002.
246-07.jpg
246-0765 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
246-11.jpg
246-1165 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
246-30.jpg
246-3065 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline with the normal 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
246-32.jpg
246-3265 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 136 which is from the original order for 285 waggons from Nippon Sharyo Japan. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
246-33.jpg
246-3365 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 925 a Centurion Industries WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
     
37 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional