Most viewed - 0255 |

255-37365 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line joining the East Mainline, the mileage is 76.3 km on the Robe and 78.4 on the HI. The interconnecting line branches off the Robe River Cape Lambert to Deepdale line at the 71.1 km. Geodata location here. May 2002.
|
|

255-28363 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85 and sisters 9410, 9420 and 9414. Geodata location here. May 2002.
|
|

255-36359 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the left joining the HI Tom Price line. Train Control board for crews to change channels. May 2002.
|
|

255-12358 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.
|
|

255-13357 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale line is on the right. Geodata location here. May 2002.
|
|

255-04353 viewsSiding Three back track, Robe 9456 Tamper 1, a Fairmont Tamper Mk VI switch tamper machine. May 2002.
|
|

255-18353 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.
|
|

255-02352 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.
|
|

255-23351 viewsWestern Creek, looking south alongside the Robe River interconnecting line with the Western Creek bridge, in the far background the pole line is the Hamersley Iron Dampier to Tom Price line. Geodata location here. May 2002.
|
|

255-33351 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425, 9410, 9420 and 9414 with serial number 8206-11 / 91-124. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.
|
|

255-09348 viewsSiding Three looking south at the south end points, switch machine and various cabinets and solar panels and DD or dragging equipment detector bars. May 2002.
|
|

255-34347 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the right heading around to join the Cape Lambert to Deepdale line. Train Control board for crews to change channels. May 2002.
|
|

255-10342 viewsSiding Three looking south at the south end signal for loaded trains or up movements. Various cabinets and DD or dragging equipment detector bars. May 2002.
|
|

255-15340 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.
|
|

255-17338 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.
|
|

255-14337 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left while the Deepdale line is on the right. Geodata location here. May 2002.
|
|

255-11331 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.
|
|
|
|
|
|
|