Most viewed - Roy_Hill_Rolling_Stock |

250501 0310285 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2395 - GA 2396, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0457283 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2117 - GA 2118, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0307269 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2197 - GA 2198, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0472265 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3089 - GA 3090, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0341263 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3431 - GA 3432, built in China by CSR Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

150314 7779261 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2080 side view showing the SSRM bogie. March 14. 2015.
|
|

250501 0547259 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2857 - GA 2858, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0314251 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3181 - GA 3182, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150314 7795251 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2238 side view showing the logo and park brake details. March 14. 2015.
|
|

250501 0315250 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2291 - GA 2292, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0346249 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3243 - GA 2444, built in China by CSR Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0434249 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3601 - GA 3602, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0304248 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2943 - GA 2944, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0435246 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2627 - GA 2628, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0471246 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3453 - GA 3454, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

150314 7776243 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2080 side view showing the park brake arrangement. March 14. 2015.
|
|

250501 0306239 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2985 - GA 2986, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0554239 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2931 - GA 2932, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150314 7764238 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2231 end view showing where the bar coupling will go and the pipe and electrical connection for the married pair. March 14. 2015.
|
|

250501 0550237 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2835 - GA 2836, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
| 256 files on 13 page(s) |
1 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|