Most viewed |

194-32524 viewsYandi campsite for Henry Walker operated iron ore mine owned and managed by BHP, view of camp are from man cage on Kato 50 tonne hydraulic crane.
|
|

205-10524 viewsWittenoom, Bee Gorge, rock carving.
|
|

205-12524 viewsWittenoom, Bee Gorge, rock carving.
|
|

207-05524 viewsYandi One balloon loop, Goninan built ore waggon 4146 coupled to an original style Comeng waggon on the empty side of the load-out tunnel, August 1999.
|
|

217-09524 viewsKeswick Terminal, logo on the side of passenger coach as part of 'The Ghan' consist from Adelaide to Alice Springs.
|
|

060116 2685524 viewsWOE type iron ore waggon WOE 33297 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-002 and fleet number 796 for Koolyanobbing iron ore operations, shows builders plate AMTECH AEI tag and Barber S2 bogie with load compensating device, West Kalgoorlie 16th January 2006.
|
|

030405 133536524 viewsWudinna, view of vertical point lever and 'dumbbell' point indicator, 5th April 2003.
|
|

030407 083359524 viewsWudinna, empty grain train shunts back onto train on the mainline, former Australian National Co-Co locomotive AE Goodwin ALCo model DL531 830 class units 851 serial no. 84137 has been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.
|
|

030409 140546524 viewsWharminda, loaded grain train arrives behind 830 class unit 851 AE Goodwin ALCo model DL531 serial 84137, 851 has spent its entire operating career on the Eyre Peninsula, with fellow 830 class 842 serial 84140 and a rebuilt unit DA 4 as they stop to pick up loaded waggons.
|
|

030411 102226524 viewsKimba Grain Bunker, looking towards Kimba, grain train loading with HBN type dual service ballast / grain hopper.
|
|

060108 2046524 viewsLock, grain train being loaded by former SAR 830 class unit 842, built by AE Goodwin ALCo model DL531 serial 84140 in 1962, originally on broad gauge, transferred to Eyre Peninsula in October 1987 and, 1204 and sister 851.
|
|

060109 2093524 viewsKyancutta at the 198 km, ASR 830 class unit 842, an AE Goodwin built ALCo DL531 model loco serial 84140 leads EMD unit 1204 due to air-conditioning trouble and sister ALCo 851 across a dry salt soak with a north bound empty grain train. 9th January 2006.
|
|

060527 4076524 viewsLeonora, WN 508, pneumatic discharge nickel concentrate waggon, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
|
|

051101 6428524 viewsParkeston, AHQF waggons seen here in Loongana Limestone service, originally built by Goninan WA for Western Quarries as a batch of twenty coded WHA type in 1995. Purchased by Westrail in 1998.
|
|

151111 9485524 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
|
|

150505 7988524 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade into the cutting, the train speed is now increasing as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
|
|

160522 2328524 viewsParkeston, 7MP7 priority service train, Goninan built GE model Cv40-9i NR class units NR 113 serial 7250-09/97-312 originally built for National Rail Corporation and now in the current owners Pacific National livery.
|
|

160526 5347524 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, ABSY type ABSY 2499 covered van, originally built by Mechanical Handling Ltd SA in 1972 for Commonwealth Railways as VFX type recoded to ABFX and then RBFX before being converted from ABFY by Gemco WA to ABSY type in 2004/05.
|
|

1047 001524 viewsWelshpool, Goninan Open Day 27th August, 1988. Brand new Pilbara cab being constructed for GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 under construction for Mt Newman Mining.
Jim Bisdee photo.
|
|

041014 142225524 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th October 2004.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
120 |  |
 |
 |
 |
 |
 |
 |
|