Most viewed |

197-35424 viewsWittenoom, Colonial Mine, side view of a Mancha locomotive, view of frame with axle arrangement and battery module.
|
|

030407 085902424 viewsYaninee, station yard overview looking south for the north end, concrete SACBH silo complexes, points, lever and indicator, train control booth and shelter visible on the left. 7th April, 2003.
|
|

030407 120522424 viewsPoochera, the loaded train prepares to depart behind 830 class unit 851 AE Goodwin ALCo model DL531 serial 84137, 851 has spent its entire operating career on the Eyre Peninsula, it leads fellow 830 class 842 serial 84140 and a rebuilt unit DA 4, rebuilt from 830 class unit 839 by Port Augusta Workshops, retains original serial 83730 and model DL531.
|
|

030409 120830424 viewsKielpa, former Australian National locomotive AE Goodwin ALCo model DL531 830 class unit 842 serial 84140.
|
|

160101 9785424 viewsWittenoom Gorge, Gorge Mine area, view inside the drive, mine adit no. 5.
|
|

160101 9794424 viewsWittenoom Gorge, Gorge Mine area, asbestos mining remains, mine adit 3 is behind this pile of rubble. Geodata.
|
|

160101 9802424 viewsWittenoom Gorge, Gorge Mine area, old building slabs and foundations looking east. GeoData.
|
|

150505 7990424 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade into the cutting, the train speed is now increasing as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
|
|

160525 4483424 viewsParkeston, 3PM7 priority service train, RRAY 7249 platform 4 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, 48' deck with a 48' Pacific National curtainsider PNXC 5670.
|
|

160527 5565424 viewsKaronie, 4MP5 intermodal train, Goninan built GE model Cv40-9i NR class unit NR 73 serial 7250-01/97-275 leads Clyde Engineering EMD model JT46C AN class AN 9 serial 93-1305.
|
|

160523 2944424 viewsParkeston, 7SP3 intermodal train, RQQY 7003 platform 4 of 5-pack articulated skel waggon built as a 'one off' by AN Rail Islington Workshops in 1994 as REQY with electric power connections, Royal Wolf RVTU 941347 40' container.
|
|

160522 2325424 viewsParkeston, 7MP7 priority service train arrives on the mainline behind a pair of Goninan built GE model Cv40-9i NR class units NR 105 serial 7250-08/97-310 and NR 113 serial 7250-09/97-312 in Pacific National livery, the track in the foreground is the Engineers Siding.
|
|

160531 9925424 viewsWest Kalgoorlie, 1MP2 steel train, RKQF 60272
|
|

160531 9944424 viewsWest Kalgoorlie, 3PM4 steel train, empty container waggon RQSY 35002.
|
|

160523 2822424 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, SCT class SCT 005 serial 07-1729 second unit is an EDI Downer built EMD model GT46C-ACe.
|
|

161109 1940424 viewsMoule, originally built by Kinki Sharyo as the NH type NH 901 for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type leader in 1984, ENH 1 with hungry boards loaded with gypsum.
|
|

WTT West 1986-09-03424 viewsWorking Time-Table Western and South Western Regions, 3rd August 1986, complete 107 page PDF download, 5.1 MB.
|
|

030403 132438424 viewsEudunda, elevated water tank.
|
|

040412 143532424 viewsNelson Point, Comeng WA built ore waggon 1760 one of 288 waggons built in 1974. 12th April 2004.
|
|

6993 001424 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
181 |  |
 |
 |
 |
 |
 |
 |
|