Most viewed |

091002 2602r526 viewsPort Hedland, at the 11.8 km on the big curve trailing BHP Billiton locomotive 4311 Poonda from the original order for thirteen SD70ACe/LC model EMD units from Electro-Motive and built in London, Ontario in August 2005 with serial 20038540-012 assists in powering an empty 330 waggon train south to the mines, these units were delivered with the round middle rail on the handrail and a standard cab which resulted in all subsequent orders having the isolated or Whisper cab fitted. 4311 and its twelve stablemates were traded back to Progress Rail and sent to the USA in January 2015. 2nd October 2009.
|
|

040816 190153r524 viewsNelson Point, BHP EMD SD40 units 3080 serial 33674 originally Southern Pacific SD40 SP 8482 and still in former owner IC&E blue and yellow livery awaits a return to service after a day at the wheel lathe 16th August 2004.
|
|

040817 011826r522 viewsNelson Point, Wheel Lathe, BHP GE AC6000 unit 6073 'Fortescue' serial 51065 wait collection following a wheel turn. 17th August 2004.
|
|

051023 6119r520 viewsNelson Point hard stand, BHP Billiton's brand new Electro-Motive built SD70ACe/LC unit 4301 serial 20038540-002 is lowered onto the rails by three Boom Logistics cranes, a 200, 160 and 120 tonne units. Sunday 23rd October 2005.
|
|

040801 144102520 viewsWalla Siding, Goninan built, Lynx Engineering designed ore waggon 4403 made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, asset number 203510 with serial 950124-004 and build date 02/2004. 1st August 2004.
|
|

212-25519 viewsComalco Clyde Engineering built EMD model GT26C unit R 1001 serial 72-752 originally numbered 1.001 and built in 1972 leads an empty train as it powers away from Lorim Point bound for Andoom. July 1995.
|
|

050625 3834519 viewsPippingarra near the 31 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.
|
|

040817 010702r517 viewsNelson Point, Wheel Lathe, BHP GE AC6000 unit 6073 'Fortescue' serial 51065 wait collection following a wheel turn. 17th August 2004.
|
|

040809 162852r510 viewsNelson Point, BHP GE AC6000 6075 'Newman' serial 51067 and EMD SD40R 3090 serial 33680 originally Southern Pacific SD40 SP 8488 depart the yard with the 1630 hrs departure on 9th August 2004. The mid-train units 5660 and 5656 can be just seen in picture.
|
|

060225 2978r510 viewsNelson Point yard sees BHP Billiton Electro-Motive built SD70ACe unit 4309 'Gidgi' serial 20038540-010 passing General Electric built AC6000 6076 'Mt Goldsworthy' serial 51068. 4309 is leading a loaded train towards the dumpers while 6076 is taking empty cars to the departure yard. 25th February 2006.
|
|

050109 093124508 viewsPilbara Railways Historical Society, removed Locotrol cab from Goninan CM40-8ML ALCo to GE rebuild unit 5663 serial 8412-08/94-154, this unit along with the two sister cab-less units all ended up having normal driving cabs retro-fitted around 1996-97. 9th October 2005.
|
|

081010 0017r508 viewsThe closest Toy Titan has got to being indoors, car ported next to a Rangie at Cullen Bay, NT 10th Oct 2008.
|
|

100508 8340r508 viewsNelson Point Loco Overhaul Workshop sees BHP Billiton Electro-Motive EMD SD70ACe/LC unit 4335 serial 20078915-002 from the fourth order for thirteen locomotives undergoing attention with blue board protection. 8th May 2010.
|
|

040817 011002r507 viewsNelson Point, Wheel Lathe, BHP GE AC6000 unit 6073 'Fortescue' serial 51065 wait collection following a wheel turn. 17th August 2004.
|
|

040815 165508507 viewsNelson Point Car Dumper 3, builders plate of Goninan built replacement ore waggon 2063, one of a batch of 345 waggons built to the new Lynx Engineering design known as the Golynx waggons serial 950088-190 and build date 04/2001. 15th August 2004.
|
|

050109 092926506 viewsPilbara Railways Historical Society, Australian built by Comeng NSW an MLW ALCo M636 unit formerly operated by Mt Newman Mining and BHP Iron Ore 5502 serial number C6096-7 built July 1976, retired in 1994 and donated to the Society in 1995. 9th October 2005.
|
|

160522 2041505 viewsWest Kalgoorlie, ATLY 1 Origin LPG tank waggon. Built as Tg type gas tank waggon by Comeng NSW as Tg 1 in Oct 1968 for South Australian Railways, to Victorian Railways in 1979 as TWF 10, then recoded to VTGX, then back to AN in 1988 as ATLX.
|
|

091002 2629r505 viewsPort Hedland, at the 11.8 km on the big curve the second set lead controlling remote BHP Billiton locomotive 4353 from the fifth order for nine SD70ACe model EMD units from Electro-Motive and built in London, Ontario in 2009 with serial 20088019-007 controls older stablemate 4303 Walla from the original SD70ACe/LC order. 4353 would later be named Warman. 2nd October 2009.
|
|

223-09504 viewsPossum Siding, Hamersley Iron rail grinder, Speno built RR 48 M-1 model sits in the back track siding. 21st October 2000.
|
|

050109 093033503 viewsPilbara Railways Historical Society, the cab from scrapped Australian built MLW M636 model MLW ALCo by Comeng NSW 5495 serial C6084-11 built in Nov-1974. Sister complete unit 5502 can be seen beyond the ALCo crank and cam shafts holding up the veranda. 9th October 2005.
|
|
16608 files on 831 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
20 |  |
 |
 |
 |
 |
 |
 |
|