Most viewed |

160522 2144471 viewsParkeston, 6MP4 intermodal train, platform 1 of 5 pack RRGY 7123 5 pack articulated skel waggon set, originally built as RRBY by AN Rail at Islington Workshops SA 1996-97, 40' deck with a Cronos 20' bulk container TINB 122901.
|
|

160531 9909471 viewsWest Kalgoorlie, 1MP2 steel train, container waggon RQHY 7078, the final one of seventy eight built in 2005 by Qiqihar Rollingstock Works in China, with two 20' steel coil 'butter boxes'.
|
|

160531 9914471 viewsWest Kalgoorlie, 1MP2 steel train, RKLY 20556
|
|

160531 9936471 viewsWest Kalgoorlie, 3PM4 steel train, Goninan built GE model Cv40-9i NR class unit NR 94 serial 7250-06/97-300 shunts empty container waggons from the yard past the 651 km post, to put on the front of its train for the journey back east.
|
|

160531 9943471 viewsWest Kalgoorlie, 3PM4 steel train, empty RQFY 4 container waggon, built by Victorian Railways Bendigo Workshops in April 1978 in a batch of forty QMX type skeletal container waggons, in July 1980 re-coded to VQFX, in October 1994 re-coded to RQFX and 2CM bogies fitted.
|
|

160601 10116471 viewsWest Kalgoorlie, 2MP5 intermodal train, RRXY 9 platform 1 of 5-pack well waggon set, one of eleven built by Bradken Qld in 2002 for Toll from a Williams-Worley design with a 20' Transamerica Leasing 22T6 type ISO tank T 2614 and a 20' Cronos 2EB0 type box TSPD 122162.
|
|

160601 10131471 viewsWest Kalgoorlie, 2MP5 intermodal train, RRIY 0001 well waggon, a single well waggon rebuilt by Gemco WA from donor waggon five well set RQZY 7061 in 2006, makes a rear visit to WA with a Toll 40' 4FG1 type box TRRC 410605[4].
|
|

160609 0390471 viewsWoodbridge, MISS FIRE!! 5PM5 intermodal train arrives at the triangle and splits signal post 82 and 84 with power from Goninan built GE model Cv40-9i NR class unit NR 35 serial 7250-06/97-237 and a sister unit with 39 waggons for a length of 1791 metres and 3960 tonnes. Behind the crew coach are the Sadleirs louvre vans and an RMEY triple deck articulated car carrying waggon.
|
|

160522 2281471 viewsParkeston, SCT train 6MP9 operating from Melbourne to Perth, ABSY type ABSY 2662 covered van, originally built by Comeng NSW in 1973 for Commonwealth Railways as VFX type, recoded to ABFX and RBFX to SCT as ABFY before conversion by Gemco WA to ABSY in 2004/05.
|
|

160523 2834471 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PWWY type 100 tonne well waggon PWWY 0019 is one of forty well waggons built by Bradken NSW for SCT, loaded with a 48' MFG1 box SCFU 407016 and a 40' 4EG1 SCT 40226.
|
|

160524 3708471 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, ABSY type ABSY 4458 covered van, originally built by Comeng WA in 1977 for Commonwealth Railways as VFX type, recoded to ABFX and RBFX to SCT as ABFY before conversion by Gemco WA to ABSY in 2004/05.
|
|

160530 9136471 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, Gemco WA built PQIY type 80' container flat PQIY 0002 loaded with two 40' RFRA type SCT reefers SCTR 131 and SCTR 118.
|
|

161109 1889471 viewsMoule, train 4DD4 rumbles along the mainline behind Genesee & Wyoming locomotives Clyde Engineering EMD model JL22C units 1601 serial 71-728 and 1603 serial 71-730 and a pair of AE Goodwin ALCo model DE531 units 859 serial 84705 and 850 serial 84136 with 62 loaded waggons.
|
|

040530 143906471 viewsNelson Point, compressor waggon set No. 6, made from a pair of cut down Magor USA built 91 ton ore waggons, originally ex Oroville Dam, California.
|
|

040616 162154471 viewsNelson Point, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|

050319 0137471 viewsNelson Point, view of the Steel Train set sitting out in the South Yard, cut down Magor USA built former Oroville Dam 91 ton ore waggon, now used as the crib waggon on the rear of the Steel Train.
|
|

WTT West 1986-09-03471 viewsWorking Time-Table Western and South Western Regions, 3rd August 1986, complete 107 page PDF download, 5.1 MB.
|
|

040502 085554471 viewsMooka Siding, trailing view of the 'Pony' heading south, 50 ton waggon 6701, one of three 'special' waggons converted from Magor USA built ore waggons, loaded with concrete sleepers is in the middle with former Goldsworthy flat waggon 8704 closet to camera.
|
|

030403 111807471 viewsKapunda station yard, north end looking north, old lattice signal mast, taken from Railway Pde looking across Coghill Street. GeoData.
|
|

20956471 viewsBassendean, Goninan workshops, sitting outside the gates waiting to head to Cape Lambert, Robe River Goninan GE CM40-8M rebuild unit 9411 serial 8206-02 / 92-125, retains its original Robe River road number on a hundred and twenty wheel road float. 9411 was rebuilt into the GE CM40-8M unit from AE Goodwin ALCo M636 serial G6060-2. February 1992.
Jim Bisdee photo.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
208 |  |
 |
 |
 |
 |
 |
 |
|