Most viewed |

060111 2246173 viewsTooligie, Mac's Road grade crossing at the 110 km, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train north. 11th January 2006.
|
|

060113 2425173 viewsCeduna, class leader of the NJ and now 1600 class 1601 and formally NJ 1 'Ben Chifley', a Clyde Engineering EMD JL22C model serial 71-728, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981, in current owners livery.
|
|

060113 2432173 viewsThevenard, at the Gypsum Resources Australian (GRA) gypsum unloading site, 1604 leads a triple consist of Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. Friday 13th January 2006.
|
|

030409 142039173 viewsWharminda, loaded grain train with 830 class unit 851 AE Goodwin ALCo model DL531 serial 84137, 851 has spent its entire operating career on the Eyre Peninsula, leads fellow 830 class 842 serial 84140 and a rebuilt unit DA 4.
|
|

070527 9174173 viewsParkeston, AZQF 1966 heavy weight waggon, originally built by Commonwealth Railways Port Augusta Workshops in November 1966, issued as 1966, coded Q, then later to AZQF, fitted with narrow gauge rails on deck for conveyance of rollingstock between Port Augusta and Marree. Seen here in use with ARG loaded with Loongana Limestone equipment.
|
|

221-15173 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.
|
|

191-09173 viewsSeymour, looking south at the northern most Goulburn River bridge, end of Gordon Crescent Seymour, quarry to the left. V/Line G class G 519 with down Sydney Express on the standard gauge, broad gauge lines on the right, Seymour behind photographer.
|
|

160101 9768173 viewsWittenoom Gorge, Joffre Creek, Fourth Crossing Pool view of the western wall gorge, via Bolitho Road. Geodata: -22.2804483 118.3212850
|
|

160101 9805173 viewsWittenoom Gorge, Gorge Mine area, looking north, the line of the drive is visible and in the middle background is adit #6. GeoData.
|
|

160103 DJI 0073173 viewsColonial Mill and mine ruins located within Wittenoom Gorge. Concrete foundations remain of the once impressive crusher, mill, dryer and bagging plant. See images of the site intact here . Geodata: -22.3090405 118.3190116 .
|
|

060110 2167173 viewsCummins, view across Railway Terrace of empty grain train runs into the yard along the mainline having completed its' shunt behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|

160523 2719173 viewsParkeston, 1PM5 intermodal train, RRQY 7324 5 pack articulated skel waggon set built by Qiqihar Rollingstock Works China in 2005 for Pacific National, with three FCL 48' boxes, a 40' flatrack and a 48' Linfox box.
|
|

160522 2152173 viewsParkeston, 6MP4 intermodal train, NQKY 34633 container waggon was originally built in a batch of two hundred CDY type open waggons by EPT (Electric Power Transmission) NSW between 1975 and 1976. Recoded to NOCY then modified in 1997 to NQKY. Loaded with a Pacific National 48' curtainsider container PNXM 5218.
|
|

161112 2988173 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, AQNY type waggon AQNY 32162 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with two original style sulphur containers S151G G943 and S54D G822 both with the siding tarpaulins and walking man logos.
|
|

22662173 viewsBassendean, during an Open Day at the Goninan workshops, a GE CM40-8M rebuild under way within the workshops, possibly 5635. 20th July 1991.
Jim Bisdee photo.
|
|

240-30173 viewsSeven Mile, Pilbara Rail, Robe River owned, General Electric built Dash 9-44CW unit 9470 serial 53455. This and sister units 9471 and 9472 were the first painted in the Pilbara Rail livery. 31st August 2002.
|
|

242-11173 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

242-16173 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

180615 1625173 viewsGoldsworthy Junction, BHP stabled rail or steel train holds the former Goldsworthy mainline between the junction and Node 1 due to upgrading track works within the flash butt yard behind Electro-Motive Diesel built SD70ACe 4360 serial 20098203-005 in late afternoon light. 15th June 2018. GeoData.
Photo by Roland Depth.
|
|

200914 7772173 viewsPilbara Railways Historical Society, ALCo built locomotive model S-2 serial 69214 built in 1940 for the Spokane, Portland and Seattle as their #21 and retired in 1964 before coming to Australia in September 1965, numbered 007 and called 'Mabel'. Retired in December 1972 and donated to the Society in 1976. 14th September 2020.
|
|
16909 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
229 |  |
 |
 |
 |
 |
 |
 |
|