Most viewed |

091002 2608r761 viewsPort Hedland, at the 11.8 km on the big curve lead controlling remote BHP Billiton locomotive 4354 from the fifth order for nine SD70ACe model EMD units from Electro-Motive and built in London, Ontario in 2009 with serial 20088019-008 controls two older EMD units in an ex-UP SD40-2 3081 and ex-SP SD40R 3091. 4354 would later be named ANZAC and also trial handrail modifications, 2nd October 2009.
|
|

050109 093033760 viewsPilbara Railways Historical Society, the cab from scrapped Australian built MLW M636 model MLW ALCo by Comeng NSW 5495 serial C6084-11 built in Nov-1974. Sister complete unit 5502 can be seen beyond the ALCo crank and cam shafts holding up the veranda. 9th October 2005.
|
|

040810 130942r760 viewsThe 226 km between Hesta and Shaw sidings, BHP GE AC6000 6074 'Kalgan' serial 51066 leading EMD SD40R 3088 serial 31513 originally Southern Pacific SD40 SP 8432 with a loaded train powering upgrade 10th August 2004.
|
|

050624 3268759 viewsBroome Rd grade crossing at the 57.1 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy across the highway 24th June 2005.
|
|

030415 065944757 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 6 serial 71-733, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.
|
|

050624 3220757 viewsAllan Siding, 40.2 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy past a 25 kph speed restriction 24th June 2005.
|
|

104-05756 viewsBuangor crossing loop, yard view looking west, mechanical somersault semaphore signal post 5, Down Home, facing camera and mechanical somersault semaphore signal post 6, Up Home, in the distance facing west, point rodding following No.1 Rd to the points.
|
|

178-01756 viewsCressy, the peace of this once former four way junction station is shattered as V/Line down broad gauge goods train 9169 to Adelaide powers past the station building along the crossing loop behind a quad of screaming EMD 2 stroke locomotives, an Australian National BL class is leading the charge.
|
|

040810 134944r756 viewsGarden Siding, BHP GE AC6000 6074 'Kalgan' serial 51066 leading EMD SD40R 3088 serial 31513 originally Southern Pacific SD40 SP 8432 with a loaded train is in full dynamic with air brake applied to keeps the train under control down the 1 in 40 grade between Shaw and Garden here at the Garden South arrival signal 10th August 2004.
|
|

050625 3779756 viewsDe Grey at the 54 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland 25th June 2005.
|
|

050624 3237755 viewsAllan Siding, 45 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy raising the dust running along the resleepered and tamped section 24th June 2005.
|
|

242-05753 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
|
|

110-11751 viewsBenalla yard overview, broad gauge V/Line S class S 302 'Edward Henty' Clyde Engineering EMD model A7 serial 57-166, B class B 64 Clyde Engineering EMD model ML2 serial ML2-5 and V/Line T class loco T 403 with serial 67-498 a Clyde Engineering Granville NSW built EMD model G18B with stabled down Wodonga goods train 9303, point indicators.
|
|

030415 070408751 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. In the background are the old loading bins. At the Kevin loading point.
|
|

040409 123052747 viewsBoodarie, Goldsworthy service bottom discharge Tomlinson Steel WA built ore waggon 8050. 9th April 2004.
|
|

150505 7986746 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade at an increasing speed as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
|
|

050624 3327746 viewsGoldsworthy Siding, 110.8 km on the GML sees BHP Billiton Goninan GE rebuild model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy entering the passing siding. 24th June 2005.
|
|

113-01745 viewsBallarat station platform, Lydiard St signal box and signal gantry looking west from under station canopy, V/Line broad gauge up Adelaide goods train 9150 arrives behind C class C 506 Clyde Engineering EMD model GT26C serial 76-829 and G class G 538 Clyde Engineering EMD model JT26C-2SS serial 89-1271, in miserable conditions.
|
|

100-04744 viewsAlbury yard view, Sydney bound goods, trailing shot, looking north, from Wilson Street footbridge, old Dalgety's building on the left, signal post AY61, louvre vans and motorail waggons on the right. Geodata.
|
|

050624 3249744 viewsTabba Tabba Creek, 46.5 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy on top of the bridge 24th June 2005.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
25 |  |
 |
 |
 |
 |
 |
 |
|