Most viewed |

161111 2516365 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AZDY 30728, one of about fourteen WBAX vans converted to AZDY type sodium cyanide container waggon, originally built by WAGR Midland Workshops as one of seventy five WV/X type covered vans in 1967-68, converted late 1988/9 to WQDF.
|
|

161112 2984365 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, non-handbrake end of AZKY type anhydrous ammonia tank waggon AZKY 32241, one of twelve waggons built by Goninan WA in 1998 as type WQK for Murrin Murrin traffic fitted with Bis INDUSTRIES anhydrous ammonia tank A3F.
|
|

050421 1142365 viewsGillam Siding backtrack, BHP's ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401, 94.9 km marking on the rail. 21st April 2005.
|
|

244-21365 viewsPort Lincoln loco workshops, still wearing the former owners AN livery, Australian Southern NJ class leader NJ 1 'Ben Chifley' Clyde Engineering EMD model JL22C serial 71-728, in multiple unit consist, roster shot. 6th April, 2003.
|
|

244-27365 viewsPort Lincoln loco workshops, still wearing the former owners AN livery, Australian Southern NJ class NJ 4 Clyde Engineering EMD model JL22C serial 71-731, cab front view. 6th April 2003.
|
|

170729 0145365 viewsEmu Siding, a loaded Rio Tinto train rolls down grade past the signals at the 74.8 km West Mainline behind Rio Tinto stripe liveried General Electric built ES44DCi unit 8194 serial 61853 and plain silver sister unit 8111 and Dash 9-44CW stablemate 7055 as they head to the Cape Lambert port for unloading. 29th July 2017. GeoData
|
|

060723 7825365 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
|
|

23694365 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993. December 1992.
Jim Bisdee photo.
|
|

24902365 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5504 serial C6104-2 sits out the back in a partially stripped state with fellow unit 5503. Both of these units was subsequently scrapped. July 1995.
Jim Bisdee photo.
|
|

030415 160138365 viewsTarcoola, station nameboard original style, is the junction for the TAR and CAR railways situated 504.5 km from the 0 km datum at Coonamia. GeoData location. 15th April 2003.
|
|

180615 1579365 viewsWalla Siding, BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP 01 and BP 02. We finally caught up with them top and tail on a ballast consist, here's BP 01.
Roland Depth photo.
|
|

190107 0534365 viewsBinduli, Mineral Resources empty iron ore train 2034 with second unit Pacific National NR class loco NR 43 with serial 7250-07 / 97-245 a Goninan Broadmeadow NSW built GE model Cv40-9i model locomotive with 4000 horsepower originally built for the National Rail Corporation.
|
|

190107 0559365 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00142 built by CSR Yangtze Co China serial 2014/382-142 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0586365 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00199 built by CSR Yangtze Co China serial 2014/382-199 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0605365 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00158 built by CSR Yangtze Co China serial 2014/382-158 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0633365 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00177 built by CSR Yangtze Co China serial 2014/382-177 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1564365 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00220 built by CSR Yangtze Co China serial 2014/382-220 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

080116 1366365 viewsChapman Siding, builders plate on FMG waggon 1395, CSR Zhuzhou Rolling Stock Works, year of 2007 and month 10 for October.
|
|

080116 1381365 viewsChapman Siding looking north inside ore waggon 2396. The visible angle iron welded to the floor are covers for the water drain holes.
|
|

246-14365 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
346 |  |
 |
 |
 |
 |
 |
 |
|