Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
160524_3654.jpg
160524 3654141 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, PBHY type covered van PBHY 0006 Greater Freighter, one of thirty five units built by Gemco WA in 2005 with the 'Greater Freighter' signage.
160526_5278.jpg
160526 5278141 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, with 76 waggons for 5709.8 tonnes and 1795 metres with EDI Downer built EMD model GT46C-ACe unit SCT 014 serial 08-1738 on the point with sister unit SCT 012 as they hold the mainline in West Kalgoorlie waiting for the Prospector railcar to cross.
161109_1901.jpg
161109 1901141 viewsMoule, former BHP RSK type iron ore waggon, modified by G&W Port Lincoln to cart gypsum and coded RSG type, RSG 7, fitted with hungry boards and loaded with gypsum.
161109_1939.jpg
161109 1939141 viewsMoule, originally Kinki Sharyo built NHA type NHA 1005 for the NAR in 1968, to EP Division 1978, rebuilt with extended sides for gypsum traffic and recoded to ENHA type ENHA 7 in 1984, heavy wall patching with hungry boards loaded with gypsum.
161111_2456.jpg
161111 2456141 viewsBinduli, Kalgoorlie Freighter train 5025, AQWY 30348 container waggon, originally built by Tomlinson Steel WA as WFX type in 1970 from a batch of one hundred and sixty one waggons, to narrow gauge as QWF type in 1970, back to SG in 1972 as WFX, recoded in 1979 to WQCX type. Loaded with two Cockburn Cement Convair type 20' tanktainers 1109 and 1108.
161111_2462.jpg
161111 2462141 viewsBinduli, Kalgoorlie Freighter train 5025, waggon APNY 31154, one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
161116_5115.jpg
161116 5115141 viewsWest Kalgoorlie, Shell fuel train 3442, ATMF 552 fuel tank waggon, one of three built by Tulloch Limited NSW as WJM type in 1971 with a capacity of 96.25 kL one compartment one dome, current capacity of 80500 litres. 551 and 552 for Shell and 553 for BP Oil, E type couplers fitted.
040815_164610.jpg
040815 164610141 viewsNelson Point, CFCLA ballast waggon CHQY type 730 and 740 both just placed on rail for BHP Iron Ore as part of the Rail PACE project.
040407_073324.jpg
040407 073324141 viewsGoldsworthy Junction, Barclay Mowlem's R.E.L.A.M lease ballast plough, Knox Kershaw KBR 850 model travels east along the Goldsworthy line past the dual headed GJ 9 signal. 7th April 2004
050407_0384.jpg
050407 0384141 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
050409_0389.jpg
050409 0389141 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 side view of cab front. 9th April 2005.
030403_154420.jpg
030403 154420141 viewsGladstone, former South Australian Railways AE Goodwin built DL500G ALCo designated the 700 class, class leader 701 serial G6042-2 leads a grain train with an ALF class and first waggon a former WAGR WW now WWS grain waggon, train being loaded on the 3rd April 2003.
030403_162155.jpg
030403 162155141 viewsCrystal Brook, view of rear end of CLF class leader CLF 1 'City of Whyalla' serial 93-AN-1, rebuilt by MKA to EMD model AT26C-2M from CL class unit CL 2 in 1993, coupled to a 600 class ALCo unit. 3rd April 2003.
030404_083008.jpg
030404 083008141 viewsPort Germein, Perth bound steel and intermodal hurries through on the main with empty steel loading on the rear. 4th April 2003.
030404_103651.jpg
030404 103651141 viewsPort Augusta Spencer Junction yard, National Rail Goninan built GE Cv40-9i model NR class unit NR 50 serial 7250-08 / 97-252 lay about the yard in between jobs. 4th April 2003.
030404_104430.jpg
030404 104430141 viewsPort Augusta Spencer Junction yard, National Rail Goninan built GE Cv40-9i model NR class unit NR 34 serial 7250-06 / 97-236 sits in the yard in between jobs. 4th April 2003.
030404_125227.jpg
030404 125227141 viewsPort Augusta Spencer Junction yard, a pair of back to back National Rail NR class units built by Goninan as GE Cv40-9i models showing the coupling between two unit, NR 50 serial 7250-08 / 97-252 is on the right. 4th April 2003.
170728_09819.jpg
170728 09819141 viewsWestern Creek, a disabled train from Mesa A on the right behind ES44ACi unit 9103 has relief locos 7082 serial 47761 a General Electric built Dash 9-44CW and a General Electric built ES44DCi unit 8137 ease up to couple onto 9103s disabled train. This image shows all these models of locomotive on the Rio Tinto mainline roster as an empty train climbs upgrade under the bridge. 28th July 2017. GeoData.
170729_0119.jpg
170729 0119141 viewsGreen Pool, as they cross the #6 bridge on the original Robe River line with their train snaking all the way back to Western Creek, General Electric built ES44DCi unit 8114 serial 59106 in original silver livery and operating in AutoHaul™ with later sister units 8120 and 8148 with a loaded train from Yandicoogina. 29th July 2017. GeoData.
170729_0191.jpg
170729 0191141 views109 km on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 drag upgrade. 29th July 2017. GeoData.
16909 files on 846 page(s) 347

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional